  ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  1836   Tuesday, December 04, 2018, 12:36 David WangITEStandard OperationTM4UCx 26.TM4 has been connected in ITE/ Checklist.TM4 has been connected in ITE. See attachment
for connection checklist
 UCx26_TM4_connection_checklist.pdf 
  1803   Wednesday, October 10, 2018, 07:52 David WangITEStandard OperationTM4Ta#57TM4 has been connected in ITE.TM4 has been connected in ITE. see attachment.  TM4_with_TA#56_connection_in_ITE.pdf 
  2184   Wednesday, February 03, 2021, 09:14 David WangConditioning StationStandard OperationTM4 TM4 from TCS to SW silo.TM4 is moved from TCS to SW silo. The moving
is smooth.
 
  
  262   Thursday, March 14, 2013, 07:09 David WangSouth Hot-CellStandard OperationTM4 TM4 electrical test at SHC after windown and containment box back.TM4 electrical test at SHC after windown
and containment box back is done. Everything
is fine. 
  
  2409   Tuesday, January 24, 2023, 14:22 David WangSouth Hot-CellStandard OperationTM4UCx#41TM4 electrical check with and without target at SHCTM4 electrical check with UCX41target and
without target at SHC.  The results
are good. See attachment.
 TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf 
  2333   Tuesday, June 21, 2022, 17:49 Frank SongITEStandard OperationTM4UCx#37TM4 disconnection the module with target UCx37 was
disconnected in ITE.
 TM4_with_UCx#37_disconnection_in_ITE.jpg 
  111   Tuesday, May 22, 2012, 12:36 David WangITEStandard OperationTM4sic 27TM4 connection in ITEAll TM4 connections in ITE is done. The
station and TM4 is under roughing now.
  
  1985   Friday, September 13, 2019, 13:36 David WangITWStandard OperationTM4UCX27TM4 conenction in ITW checklistTM4 was connected in ITW this Tuesday.
See attachment for checklist.
 TM4_UCx27_connection_checklist.pdf 
  2535   Friday, January 26, 2024, 11:57 David WangSafe Module ParkingStandard OperationTM4 TM4 coil1, 2, and HS electrical check at SMP after module moving.TM4 coil1, 2 and HS are all OL at 250V
at SMP after module move. This week, Chad
and Carl fixed short issue on coil1, 2 and
  
  454   Friday, September 13, 2013, 08:05 David WangSouth Hot-CellRepairTM4 TM4 coil 1 leak check in SHCLeak checked TM4 coil1 in SHC with Isaac
. The leak detector only can pump down to
1.5xE-7 atm.cc/sec. The leak detector got
 TM4_coil_1_leak_check.pdf 
  731   Monday, August 11, 2014, 14:27 David WangConditioning StationStandard OperationTM4 TM4 are vented with argon and disconnected at CS.TM4 are vented with argon and disconnected
at CS this morning.
  
  1452   Thursday, March 16, 2017, 10:32 David WangSpent Target VaultRepairTM4 TM4 and its silo rust photosI watched rust on TM4 and its silo. Most
of rust are on est side of module and silo.
See attachments
 13x 
  2633   Friday, July 05, 2024, 12:50 David WangSouth Hot-CellStandard OperationTM4TiC#7TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation .TM4 and TiC#7 target electrical check and
HS leak check at SHC after target installation
have been done.  all results are good.
  
  1258   Tuesday, June 07, 2016, 18:17 David WangConditioning StationStandard OperationTM4UC#16TM4 and TCS turbo pumps are started.TM4 and TCS vacuum system are connected.
  Turbo pumps are started.  Everything
is fine so far.
  
  621   Thursday, March 13, 2014, 07:35 David WangITWStandard OperationTM4 TM4 and ITW turbo pumps have been startedI connected ITW  vacuum system to
TM4. TM4 and ITW turbo pumps have been started
successfully. The pumping down is good so
  
  625   Wednesday, March 19, 2014, 15:46 David WangITWStandard OperationTM4 TM4 and ITE air to vacuum leak check and TM4 water lines helium test.With TM4 located in ITW, All air to vacuum
seals  on ITW primary and  secondary
vacuum vessels have been leak  checked
 7x 
  929   Tuesday, June 02, 2015, 14:39 David WangConditioning StationStandard OperationTM4SiC #31TM4 and CS turbo- pumps are started .TM4 and CS turbo-pumps are started this
afternoon. Everything is good so far.
  
  143   Friday, July 06, 2012, 14:38 David WangConditioning StationStandard OperationTM4UO#3TM4 UO#3 target heat shield helium pressure check is done.Connected leak detector to TM4 and CS vacuum
system. The vacuum readings  on TM4 and CS:PNG4
3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic
  
  1256   Tuesday, June 07, 2016, 17:11 David WangConditioning StationStandard OperationTM4UC#16TM4 UCx16 electrical check and leak check at SHCChad and I finished the TM4 UCx6 electrical
check and leak check at SHC. Leak check result
on HS line is good. There is a dead short
 UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf 
  2118   Friday, July 03, 2020, 13:23 David WangSouth Hot-CellStandard OperationTM4UCx#30TM4 UCx#30 Electrical check and HS leak checkElectrical and leak check are good. See
attachment. 
 TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf 