Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1258
Entry time:
Tuesday, June 07, 2016, 18:17
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM4
Target/Number:
UC#16
Subject:
TM4 and TCS turbo pumps are started.
TM4 and TCS vacuum system are connected. Turbo pumps are started. Everything is fine so far.
ELOG V2.9.2-2455