Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1256     Entry time: Tuesday, June 07, 2016, 17:11
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#16 
Subject: TM4 UCx16 electrical check and leak check at SHC 

Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z" repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment

 Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2

Attachment 1: UCX_16_electrical_test.pdf  278 kB  | Show | Hide all
Attachment 2: electrical_check._TM4_UCx16_at_TCS..pdf  82 kB  Uploaded Wednesday, June 08, 2016, 12:22  | Show | Hide all
ELOG V2.9.2-2455