Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1836     Entry time: Tuesday, December 04, 2018, 12:36
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx 26. 
Subject: TM4 has been connected in ITE/ Checklist. 

TM4 has been connected in ITE. See attachment for connection checklist

Attachment 1: UCx26_TM4_connection_checklist.pdf  483 kB  | Show | Hide all
ELOG V2.9.2-2455