Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1985     Entry time: Friday, September 13, 2019, 13:36
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM4 
Target/Number: UCX27 
Subject: TM4 conenction in ITW checklist 

TM4 was connected in ITW this Tuesday. See attachment for checklist.

Attachment 1: TM4_UCx27_connection_checklist.pdf  360 kB  | Show | Hide all
ELOG V2.9.2-2455