1123
|
Thursday, November 12, 2015, 13:25 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check and leak check | Target to Anode and target to Common showed
~ 500 kOhm values. No leaks above 3E-9 atm-cc/s
seen. See attached. |
|
1124
|
Monday, November 16, 2015, 08:04 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Update TH schedule according to changes.
See attachment 1,2 .
update TH schedule weekly. See attachments |
   |
1125
|
Monday, November 16, 2015, 10:09 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check after HV conditioning | Problem found between ANODE (F) and
chassis 90 kOhm. See attachment for details. |
|
1126
|
Monday, November 16, 2015, 10:33 |
Anders Mjos | Conditioning Station | Standard Operation | | FEBIAD Test Target | HV conditioning by ISAC operators | ISAC operators attempted HV conditioning
over the weekend.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=218447&style=entry |
|
1132
|
Tuesday, November 24, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | | Ta#46 | Ta#46 has been removed from TM4. |
|
1133
|
Wednesday, November 25, 2015, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#46 | Module moved | Yesterday TM#4 with Ta#46 was moved from
the east station to the south hot cell. |
|
1134
|
Wednesday, November 25, 2015, 11:55 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#14 | Module moved and electrical check. | TM#4 with UC#14 was moved from the south
hot cell to the conditioning station.
Here are the results of the electrical check |
|
1135
|
Wednesday, November 25, 2015, 14:13 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#14 | UCx#14 | UCx#14 installed onto TM4. High current
fasteners torqued to 130 in lbs. |
|
1137
|
Wednesday, November 25, 2015, 15:37 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#14 | Conditioning | Wednesday, November 25, 2015, 15:36:
RGA on
Thursday, November 26, 2015, |
|
1138
|
Thursday, November 26, 2015, 06:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#14 | TM4 vacuum has been connected in TCS. | TM4 vacuum has been connected in TCS. All
vacuum pumps were started yesterday. The
pumping down of TM4 and TCS are good so far. |
|
1139
|
Thursday, November 26, 2015, 07:34 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#14 | Helium pressure test on TM4 HS line at CS | I did helium pressure test on TM4 HS line
at TCS this morning. 70psi helium 3
minutes, 0.0xE-9 atm.cc/sec base leak rate. |
|
1140
|
Thursday, November 26, 2015, 07:37 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#14 | TM4 has been connected at CS | TM4 has been connected at TCS. The water
system is started. The TCS HV cover for TM4
is installed also. Basically, The TM4 is |
|
1141
|
Thursday, November 26, 2015, 08:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#46 | Spent Target move | Ta#46 was placed in the ISAC spent target
vault yesterday. See attached PDF for details. |
|
1142
|
Monday, November 30, 2015, 11:46 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update TH schedule according to
changes. see attachment 1,2 .
Update TH schedule before the weekend. |
   |
1143
|
Tuesday, December 01, 2015, 06:41 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#14 | Turned off TCS all vacuum pumps and water pumps. | I turned off TCS vacuum and water pumps.
The TSC and TM4 are still under vacuum condition. |
|
1144
|
Tuesday, December 01, 2015, 11:26 |
Travis Cave | ITE/ITW Cooling | Standard Operation | TM4 | UC#14 | Module moved | TM#4 with UC#14 has been moved from the
conditioning station to the east target station. |
|
1146
|
Tuesday, December 01, 2015, 14:30 |
David Wang | ITE | Standard Operation | TM4 | UCx 13 | TM4 has been connected in ITE | TM4 has been connected in ITE. All turbo-pumps
are started. Everything is good so far. |
|
1148
|
Thursday, December 10, 2015, 13:17 |
Anders Mjos | Conditioning Station | Standard Operation | | | Blank off flange | Thursday, December 10, 2015, 13:17: Roughing
Thursday, December 10, 2015, 14:56:
Started TP1S |
|
1152
|
Wednesday, January 13, 2016, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#35, Ta#39, SiC#27, UC#12, ThO#1 | Spent targets moved to mini storage. | Five spent targets have been moved from
the Spent Target Vault to Mini Storage in
preparation for transfer to F-308s in February. |
|
1153
|
Friday, January 22, 2016, 14:24 |
David Wang | South Hot-Cell | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule (sketch) | Post a sketch of 2016 winter shut down
target hall schedule. see attachment 1,2
UPDATE THE SCHEDULE ACCORDING |
   |