Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1137     Entry time: Wednesday, November 25, 2015, 15:37
Author: Anders Mjos 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#14 
Subject: Conditioning 

 Wednesday, November 25, 2015, 15:36: RGA on


Thursday, November 26, 2015, 09:55: PS energized. EE connected to power supply.

Thursday, November 26, 2015, 11:41: Applied some current and voltage to all power supplies. All looks good.

Some sparking around 5 kV. Turned out to be a bad cable connection. Fixed with David W.

Thursday, November 26, 2015, 15:04: BIAS/EL/EE 20 / 15 1.5 kV

Thursday, November 26, 2015, 15:43: Handed TCS over to ISAC operations


 Target heated over the weekend. EE went into current limiting (down to ~100 V) a while after the target was at temperature.


Monday, November 30, 2015

Target conditioned by ISAC operators to 30 kV without any problems.

EE current limit increased to about 26 mA in an attempt to recover. Cooling down target to investigate.

ELOG V2.9.2-2455