ID Date Author Category Type Module Target/Number Subjectdown
  973   Thursday, July 02, 2015, 10:22 Anders MjosConditioning StationMaintenanceTM2 TP1S failed

 See e-fault 8233. Edi assisted in diagnosing the problem. The pump will have to be replaced.

  1848   Tuesday, January 08, 2019, 08:49 David WangITWStandard OperationTM2 TP1 TP1 have been disconnected in ITW

Started argon venting of ITW now.

  1954   Friday, July 26, 2019, 11:41 David WangSouth Hot-CellStandard OperationTM4 TM4 with spare target electrical check and leak check.

Electrical check on TM4 with spare test target. PQ is still shorted to RU. But, The short between 60KV bias and PQRU which we found last time is gone.  Target to PQRU at 250V mega measurement: 22.08 M. All conductivity between ABCD are about 5.0 m ohm which are good. All other ohm meter and Mega measurements are OL. Helium spray leak check on HS target VCR fittings is passed. Two blank offs are installed on source tray window cool lines. They passed  leak checked at SHC as well. 

  1298   Tuesday, August 02, 2016, 15:22 David WangConditioning StationStandard OperationTM4UC#17TM4 with new target has been connected at TCS

It is being pumped now at TCS.

  2713   Wednesday, November 06, 2024, 16:33 David WangSouth Hot-CellStandard OperationTM4UCX46TM4 with UCx46 electrical and leak check at SHC

TM4 with UCx46 electrical and leak check at SHC is done. Everything is good.

Attachment 1: TM4_UCx46_electrical_check.pdf
TM4_UCx46_electrical_check.pdf TM4_UCx46_electrical_check.pdf
  1257   Tuesday, June 07, 2016, 17:14 David WangConditioning StationStandard OperationTM4UC#16TM4 with UCx16 target has been moved from SHC to TCS.

Bill and Yasmine did the move remotely this afternoon. The move is successful.

  1260   Thursday, June 09, 2016, 08:37 David WangConditioning StationStandard OperationTM4UC#16TM4 with UCx16 helium pressure test at TCS

I did a helium pressure test on TM4 at TCS with UCX16 target installed on the module. No leak has been found on all using water lines in TM4. See attachment for detail.

Attachment 1: TM4_withUCx16_helium_pressure_test_at_TCS.pdf
TM4_withUCx16_helium_pressure_test_at_TCS.pdf
  2353   Tuesday, August 09, 2022, 12:19 Frank SongITEStandard OperationTM4Ta#64TM4 with Ta#64 disconnection in ITE

 TM4 with Ta#64 has been disconnected in ITE.

Attachment 1: TM4_with_Ta#64_disconnection_in_ITE.jpeg
TM4_with_Ta#64_disconnection_in_ITE.jpeg
  2458   Wednesday, June 14, 2023, 07:10 Frank SongITEStandard OperationTM4SiC#45TM4 with SiC#45 connection in ITE

 TM4 with new target SiC#45 was connected in ITE, all TPs are running at their full speed.

Attachment 1: TM4_with_SiC#45_connected_in_ITE_20230613.pdf
TM4_with_SiC#45_connected_in_ITE_20230613.pdf TM4_with_SiC#45_connected_in_ITE_20230613.pdf TM4_with_SiC#45_connected_in_ITE_20230613.pdf TM4_with_SiC#45_connected_in_ITE_20230613.pdf
  2358   Thursday, August 18, 2022, 10:41 Frank SongITE/ITWStandard OperationTM4SiC#44TM4 with SiC#44 connection in ITE

 TM4 with target SiC#44 was connected in ITE on Tuesday.

Attachment 1: TM4_with_SiC#44_connection_in_ITE.jpg
TM4_with_SiC#44_connection_in_ITE.jpg
  263   Thursday, March 14, 2013, 07:18 David WangSouth Hot-CellStandard OperationTM4 TM4 window cooling line leak check

It took a long time(more than 1 hour)   to pump down the TM4 window  cooling line during leak check time. The base leak rate could only be pumped to 5.8xE-9 atm.cc/sec.Base pressure is 0.0xE-4 torr which is bottom reading. Chad and i did the leak check at this base leak rate .No leak had been found. The window cooling line is leak tight at this stage. A pressure helium test will be fulfilled in conditioning station on this cooling line later.

  1966   Friday, August 16, 2019, 08:51 David WangConditioning StationRepairTM4 TM4 waterlines helium pressure test at TCS.

LD base leak rate, 0.0Xe-9atm.cc/sec. Helium pressure, 70psi. 5 minutes each circuit. No response on all water line except containment box window which has a VCR leak issue now. Window line leak rate, 2.3Xe-4 atm.cc/sec.

  2405   Tuesday, January 24, 2023, 07:17 David WangITEStandard OperationTM4UCx#41TM4 water lines helium pressure test 2023.

TM4 water lines helium pressure test was done yesterday at ITE. All water lines were air purged one day ahead  for the test. No leak  has been found on TM4 waterlines during the test. See attachment for detail

Attachment 1: TM4_water_lines_helium_presuure_test_2023.pdf
TM4_water_lines_helium_presuure_test_2023.pdf
  830   Thursday, January 08, 2015, 08:04 David WangITEStandard OperationTM4 TM4 water lines have been disconnected in ITE and purged.

TM4 waterlines have been disconnected and purged in ITE. The TM4 vacuum system is still in operation.

  2296   Thursday, January 20, 2022, 08:18 David WangNorth Hot-CellStandard OperationTM4No targetTM4 was removed from NHC to S_W silo yesterday.

TM4 was removed from NHC to S_W silo yesterday.  The remove is smooth and successful.

  1797   Tuesday, October 02, 2018, 09:49 David WangITEStandard OperationTM4UCx 24#TM4 was disconnected in ITE.

TM4 was disconnected in ITE yesterday. See attachment for checklist.

Attachment 1: TM2_UCx_24#_disconnection_in_ITE..pdf
TM2_UCx_24#_disconnection_in_ITE..pdf TM2_UCx_24#_disconnection_in_ITE..pdf
  1385   Tuesday, November 01, 2016, 14:53 David WangITEStandard OperationTM4 TM4 was disconnected at ITE

TM4 was disconnected at ITE this morning. It was moved to SHC  after. No alpha alarm issue has been happened during and after move. The ventilation pumping down procedure on ITE was fulfilled during the move.

  1386   Tuesday, November 01, 2016, 14:54 David WangITEStandard OperationTM4 TM4 was disconnected at ITE

TM4 was disconnected at ITE this morning. It was moved to SHC  after. No alpha alarm issue has been happened during and after move. The ventilation pumping down procedure on ITE was fulfilled during the move.

  1138   Thursday, November 26, 2015, 06:25 David WangConditioning StationStandard OperationTM4UC#14TM4 vacuum has been connected in TCS.

TM4 vacuum has been connected in TCS. All vacuum pumps were started yesterday. The pumping down of TM4 and TCS are good so far.

  1198   Friday, April 08, 2016, 07:10 David WangConditioning StationStandard OperationTM4 TM4 vacuum has been connected in ITE.

All turbo pumps are started yesterday. The pumping down is good over night.