Message ID: 1954     Entry time: Friday, July 26, 2019, 11:41
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: TM4 with spare target electrical check and leak check. 

Electrical check on TM4 with spare test target. PQ is still shorted to RU. But, The short between 60KV bias and PQRU which we found last time is gone.  Target to PQRU at 250V mega measurement: 22.08 M. All conductivity between ABCD are about 5.0 m ohm which are good. All other ohm meter and Mega measurements are OL. Helium spray leak check on HS target VCR fittings is passed. Two blank offs are installed on source tray window cool lines. They passed  leak checked at SHC as well. 