Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2458
Entry time:
Wednesday, June 14, 2023, 07:10
Author:
Frank Song
Category:
ITE
Type:
Standard Operation
Module:
TM4
Target/Number:
SiC#45
Subject:
TM4 with SiC#45 connection in ITE
TM4 with new target SiC#45 was connected in ITE, all TPs are running at their full speed.
Attachment 1:
TM4_with_SiC#45_connected_in_ITE_20230613.pdf
124 kB
|
Show
|
Hide all
ELOG V2.9.2-2455