Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1966     Entry time: Friday, August 16, 2019, 08:51
Author: David Wang 
Category: Conditioning Station 
Type: Repair 
Module: TM4 
Target/Number:  
Subject: TM4 waterlines helium pressure test at TCS. 

LD base leak rate, 0.0Xe-9atm.cc/sec. Helium pressure, 70psi. 5 minutes each circuit. No response on all water line except containment box window which has a VCR leak issue now. Window line leak rate, 2.3Xe-4 atm.cc/sec.

ELOG V2.9.2-2455