Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2405     Entry time: Tuesday, January 24, 2023, 07:17
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#41 
Subject: TM4 water lines helium pressure test 2023.  

TM4 water lines helium pressure test was done yesterday at ITE. All water lines were air purged one day ahead  for the test. No leak  has been found on TM4 waterlines during the test. See attachment for detail

Attachment 1: TM4_water_lines_helium_presuure_test_2023.pdf  44 kB  | Show | Hide all
ELOG V2.9.2-2455