Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1260     Entry time: Thursday, June 09, 2016, 08:37
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#16 
Subject: TM4 with UCx16 helium pressure test at TCS 

I did a helium pressure test on TM4 at TCS with UCX16 target installed on the module. No leak has been found on all using water lines in TM4. See attachment for detail.

Attachment 1: TM4_withUCx16_helium_pressure_test_at_TCS.pdf  123 kB  | Show | Hide all
ELOG V2.9.2-2455