Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
785
Entry time:
Thursday, November 13, 2014, 13:52
Author:
David Wang
Category:
ITW
Type:
Standard Operation
Module:
TM1
Target/Number:
ThO#1
Subject:
5 Shielding blocks have been transferred from ITE to ITW.
Dan and I transferred 5 shielding blocks from ITE to ITW. The ITW is configured to take proton beam.
ELOG V2.9.2-2455