2029
|
Thursday, November 14, 2019, 13:52 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#22,23,24 | Targets repackaged | The targets UC#22,23,24 have been
repackaged into the newer stronger pails,
and have been placed back in the mini vault |
|
2322
|
Thursday, May 19, 2022, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Sic#39, Ta#59, C#2, UC# 32 & 30 | Targets moved to the mini vault. | Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached |
 |
2592
|
Wednesday, May 15, 2024, 10:06 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#38,40 Ta#62,63 SiC#44 | Targets moved to the mini vault. | Targets UC#38,40 Ta#62,63 SiC#44
have been moved from the spent target vault
to the mini vault in preparation for F-308 |
 |
1653
|
Thursday, October 26, 2017, 13:20 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 | Targets moved to mini storage | SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 have
been moved from the spent target storage
to the mini storage. See attached PDF for |
|
594
|
Wednesday, February 05, 2014, 14:12 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | All targets in the mini storage (4) have
been moved from there and placed into the
F-308s and those have been moved to the mech |
|
681
|
Thursday, June 12, 2014, 09:42 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | Five targets have been moved from the spent
target storage to the mini storage. The targets
that were moved are UCx #'s 6,7,8 , SiC #28, |
 |
1908
|
Thursday, April 18, 2019, 10:04 |
Travis Cave | South Hot-Cell | Maintenance | | Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45 | Target transfer from old pail to new pail. | Targets Ta#50 and SiC#34 have been
transferred from their old pails to new ones.
Ta#50 was done on April 12th 2019 it was |
|
499
|
Tuesday, October 08, 2013, 14:58 |
Anders Mjos | South Hot-Cell | Standard Operation | | SiC#29 | Target to Heat Shield electrical short | The SiC#29 CTL target has been taken apart
with the help of Isaac and Chad. Electrical
measurements were done between Target and |
|
66
|
Thursday, January 05, 2012, 11:40 |
Travis Cave | Spent Target Vault | Standard Operation | | | Target swapping | Looks like the UC target s #1 and #2 were
found invalidprize winners for their all
inclusive trip to Chalk River and have thus |
 |
2300
|
Tuesday, January 25, 2022, 12:49 |
David Wang | ITE/ITW | Standard Operation | | | Target station vacuum system visual inspection. | Two shielding blocks above vacuum
station at TH west end were opened for inspection.
Checked ITH:MP1, MP2 lubricant color and |
|
2709
|
Thursday, October 24, 2024, 10:42 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Target repacked moved to the mini vault. | On October 22 2024 the spent SIC#44
returned from CNL was repacked in a new pail
it was in pail 275 and repacked into pail |
|
2582
|
Friday, May 03, 2024, 12:20 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#66 | Target repacked | The Ta#66 target was repacked after
the parasitic target was removed it was place
in a new pail (#290) and place back in spot |
|
2685
|
Wednesday, September 18, 2024, 13:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Target removal | TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under |
13x |
1763
|
Wednesday, August 01, 2018, 15:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | UC#23 | Target mounted - water leak on HS line | The heat shield water lines were not purged
ahead of target exchange in the hot cell.
This resulted in water leaking onto the new |
|
1436
|
Thursday, February 09, 2017, 09:24 |
David Wang | Conditioning Station | Development | | | Target module window cooling lines at TCS. | Target module window cooling lines
at TCS has been modified to use spare 2 channel
in TCS: WFB1. The old cooling lines used |
|
1685
|
Tuesday, February 13, 2018, 13:54 |
Anders Mjos | ITE | Standard Operation | TM4 | SiC#37 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th |
|
1686
|
Tuesday, February 13, 2018, 13:56 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#55 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR |
|
1753
|
Monday, July 16, 2018, 17:41 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Target module disconnected | The water and electrical connections were
disconnected today as protons remained off
after power interruption during the weekend. |
 |
1817
|
Monday, November 05, 2018, 14:27 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | UC#25 | Target module disconnected | Frank and Anders disconnected the water
and electrical connections this afternoon
after the target was conditioned over the |
|
223
|
Wednesday, December 05, 2012, 15:53 |
Anders Mjos | South Hot-Cell | Standard Operation | | UCx#5 | Target inspection - target tube broken | The target was inspected today.
It was found that the target tube
had broken on both sides of the centre block |
|