Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2592     Entry time: Wednesday, May 15, 2024, 10:06
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: UC#38,40 Ta#62,63 SiC#44 
Subject: Targets moved to the mini vault. 

 Targets UC#38,40 Ta#62,63 SiC#44 have been moved from the spent target vault to the mini vault in preparation for F-308 loading. See attached PDFs for details.

Attachment 1: Mini_Vault_Index_2024-05-15.pdf  402 kB  | Show | Hide all
Attachment 2: Target_Index_2024-05-15.pdf  449 kB  | Show | Hide all
ELOG V2.9.2-2455