Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 594     Entry time: Wednesday, February 05, 2014, 14:12
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Targets moved from mini storage to F-308s 

All targets in the mini storage (4) have been moved from there and placed into the F-308s and those have been moved to the mech services room.

ELOG V2.9.2-2455