Tuesday, March 17, 2020, 11:42, Travis Cave, ITE, Standard Operation, TM4, P to N target, Module move
|
TM#4 with the P to N target has been moved from the south hot cell to the east target station. |
Tuesday, March 17, 2020, 12:58, David Wang, South Hot-Cell, Development, TM4, , P2N target electrical check and leak check at SHC.
|
See attachment. Everything looks good. |
Tuesday, March 17, 2020, 14:59, David Wang, ITE, Development, TM4, P2N, ITE turbopumps are started.
|
They work fine. Current draw on all pumps are normal. I asked operator to switch on IG1 , IG1S and PNG4. |
Wednesday, March 18, 2020, 10:40, David Wang, ITE, Development, TM4, , TM4 P2N target connection checklist.
|
TM4 has been connected in ITE. See checklist. |
Wednesday, June 17, 2020, 09:49, chad fisher, South Hot-Cell, Standard Operation, TM4, C#1, C#1 installed
|
Target C#1 has been installed on TM4 with new high current fasteners torqued to 130in lbs.
|
Thursday, June 18, 2020, 13:25, David Wang, ITE, Standard Operation, TM4, P2N test., Disconnect TM4 in ITE.
|
TM4 has been disconnected in ITE. Vacuum pumps and gauge are not disconnected yet. |
Friday, June 19, 2020, 11:21, David Wang, ITE, Repair, TM4, P2N test., ITE TP3 is replaced.
|
ITE TP3 is replaced. ITE is under vacuum again. All turbo pumps are started successfully. Current draw on pumps are normal so far. |
Monday, June 29, 2020, 10:09, David Wang, ITE, Standard Operation, TM4, P2N test., ITE turbo pumps are stopped
|
ITE venting is in processing. |
Tuesday, June 30, 2020, 10:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, Test Proton to Neutron Target, Module move
|
TM#4 has been moved from the east target station to the south hot cell. |
Friday, July 03, 2020, 07:03, David Wang, South Hot-Cell, Standard Operation, TM4, BEFORE TARGET INSTALLATION, ELECTRICAL CHECK BEFORE TARGET INSTALLATION.
|
PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500 V. THE REST ARE OL |
Friday, July 03, 2020, 08:46, chad fisher, South Hot-Cell, Standard Operation, TM4, UcX#30, UCx#30 installed onto tm4
|
UCx#30 has been installed onto TM4 with new high current fasteners torqued to 130 in lbs. |
Friday, July 03, 2020, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#30, TM4 UCx#30 Electrical check and HS leak check
|
Electrical and leak check are good. See attachment. |
Friday, July 03, 2020, 14:08, Travis Cave, ITE, Standard Operation, TM4, UC#30, Module move
|
TM#4 with UC#30 has been moved from the south hot cell to the east target station. |
Monday, July 06, 2020, 07:54, David Wang, ITE, Standard Operation, TM4, UCx 30, TM4 has been connected in ITE connection
|
TM4 has been connected in ITE. Vacuum pumping down is good so far. |
Tuesday, July 07, 2020, 17:43, Carla Babcock, ITE, Development, TM4, , RF tests on new IG-LIS wiring
|
Tested RF from RF driver into new IGLIS wires at ITE. Used 5V, 1MHz (2MHz setting because of internal halving issue).
As expected there was a very slight mismatch visible (original cable ~ 68 Ohms, new cable ~ 53 Ohms).
The matching resistor will be changed and it will be retested. |
Tuesday, September 22, 2020, 10:56, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#30, Module move
|
TM#4 with UC#30 has been moved from ITE to the south hot cell. |
Wednesday, September 23, 2020, 10:56, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#31 P2N, Uc#30 removed UC#31 P2N installed
|
UCx#30 has been removed from TM#4 and put in a can with argon. 5(10) pin connector had to have guide screws removed to be uninstalled.
UCx#31 P2N installed. |
Thursday, September 24, 2020, 11:25, David Wang, Conditioning Station, Standard Operation, TM4, UC#31, TM4 HS line leak check at SHC and TCS.
|
Both helium spray and helium pressurize on TM4 HS line withUCx31 target are done at SHC and TCS. No leak. |
Tuesday, September 29, 2020, 12:12, David Wang, ITE, Repair, TM4, , TM4 steerers staus after" left " grounding issue, and first stage investigation
|
Left (short) is switched with bottom. So on module:
"Top" is still top.
"Left" is bottom |
Tuesday, September 29, 2020, 12:29, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move
|
Module move of TM#4 with UC#31 was finished to today at around 10:30AM. |
|