Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2145     Entry time: Tuesday, September 22, 2020, 10:56
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#30 
Subject: Module move 

 TM#4 with UC#30 has been moved from ITE to the south hot cell.

ELOG V2.9.2-2455