  1913   Wednesday, May 01, 2019, 07:49 chad fisherSouth Hot-CellStandard OperationTM4UC#26UC#26 removal

UC#26 has been removed from TM4.

Attachment 1: 20190501_072940[1].jpg
20190501_072940[1].jpg
  1916   Thursday, May 02, 2019, 09:37 Travis CaveSpent Target VaultStandard Operation UC#26Spent Target Move

 The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and was 2.42mSv/hr upon removal from the south hot cell.

Attachment 1: Target_Index_2019-05-02.pdf
Target_Index_2019-05-02.pdf Target_Index_2019-05-02.pdf
  1813   Wednesday, October 31, 2018, 14:20 Travis CaveConditioning StationStandard OperationTM2UC#25Module move
TM#2 with UC#25 has been moved from the south hot cell to the conditioning station.
  1817   Monday, November 05, 2018, 14:27 Anders MjosConditioning StationStandard OperationTM2UC#25Target module disconnected

Frank and Anders disconnected the water and electrical connections this afternoon after the target was conditioned over the weekend. The heater ramping program ran with the wrong gauge selected, causing the vacuum to go higher than planned. The module will be moved to ITW tomorrow.

  1818   Tuesday, November 06, 2018, 10:59 Travis CaveITWStandard OperationTM2UC#25Module move

 TM#2 with UC#25 has been moved from the conditioning station to the west target station.

  1819   Wednesday, November 07, 2018, 09:50 Anders MjosITWStandard OperationTM2UC#25TM2 connected in ITW

TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only (dwg). Link to check list on DocuShare.

  1821   Wednesday, November 14, 2018, 16:10 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal troubleshooting

Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected.

Attachment 1: 2018-11-13_FC5.pdf
2018-11-13_FC5.pdf
  1823   Thursday, November 22, 2018, 08:53 Anders MjosITWStandard OperationTM2UC#25Block move

Frank and Anders moved blocks from ITE to ITW yesterday

  1824   Thursday, November 22, 2018, 08:55 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal limit switch installed

Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system.

Attachment 1: FC5_limit_switch.jpg
FC5_limit_switch.jpg
  1850   Wednesday, January 09, 2019, 10:47 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Module move

 TM#4 with UC#25 has been moved from ITW to the south hot cell.

  1851   Wednesday, January 09, 2019, 13:08 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Electrical Check

 Electrical check of the target module with the UC#25 attached after the beam run.

Attachment 1: Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf
Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf
  1855   Friday, January 11, 2019, 11:26 Travis CaveSpent Target VaultStandard Operation UC#25Spent Target Move

 The spent target in the south hot cell has been moved to the spent target vault. It was placed in pail 204 and placed in spot 6B. The pail is made of thicker steel and thus will not need to be repackaged later.  The ISAC spent target vault is full there is no more room for any more targets.

Attachment 1: Target_Index_2019-01-11.pdf
Target_Index_2019-01-11.pdf Target_Index_2019-01-11.pdf
  1776   Tuesday, September 04, 2018, 09:57 Travis CaveConditioning StationStandard OperationTM4UC#24Module move

 TM#4 with UC#24 has been moved from the conditioning station to the east target station.

  1798   Tuesday, October 02, 2018, 09:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#24Module move

 TM#4 with UC#24 has been moved from the east target station to the south hot cell.

  1800   Friday, October 05, 2018, 14:41 Travis CaveSpent Target VaultStandard Operation UC#24Spent Target Move

 UC#24 has been moved from the south hot cell to the spent target vault. The target is in pail #171 and placed in spot 4C. See attached PDF for details.

Attachment 1: Target_Index_2018-10-05.pdf
Target_Index_2018-10-05.pdf Target_Index_2018-10-05.pdf
  1762   Wednesday, August 01, 2018, 14:48 Travis CaveConditioning StationStandard OperationTM2UC#23Spent Target Move

 TM#2 with UC#23 has been moved from the south hot cell to the conditioning station.

  1763   Wednesday, August 01, 2018, 15:12 Anders MjosSouth Hot-CellStandard OperationTM2UC#23Target mounted - water leak on HS line

The heat shield water lines were not purged ahead of target exchange in the hot cell. This resulted in water leaking onto the new target assembly (heat shield) when the cooling lines were opened at top and bottom (for connecting leak detector). Excess water was wiped up with paper towels.

Attachment 1: 20180801_180130904_iOS.jpg
20180801_180130904_iOS.jpg
  1767   Tuesday, August 14, 2018, 10:27 Travis CaveITWStandard OperationTM2UC#23Module move

 Both the West Entrance and TM#2 with UC#23 have been moved back into their places in the west target station. The Entrance module move wasn't completely smooth as it did suffer a little bumpiness when the shield plug part was installed, I was lifted back out again and no visible damage was observed on the delicate items.

  1784   Tuesday, September 18, 2018, 12:59 Travis CaveSouth Hot-CellStandard OperationTM2UC#23Module move

 TM#2 with UC#23 has been moved from ITW to the south hot cell. The shield plug was also installed remotely as well.

  1790   Monday, September 24, 2018, 10:21 Anders MjosSouth Hot-CellStandard OperationTM2UC#23Post Irradiation Examination (PIE)

UC#23 experienced short between target and heat shield as it was heated during operation. The inspection of the target after irradiation revealed that the left target leg was close to the heat shield opening and likely the cause of the short. Marks could be seen on the leg indicating contact. See attached photo. More photos are available on DocuShare

Attachment 1: 20180924_161322929_iOS.jpg
20180924_161322929_iOS.jpg