Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1798     Entry time: Tuesday, October 02, 2018, 09:59
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#24 
Subject: Module move 

 TM#4 with UC#24 has been moved from the east target station to the south hot cell.

ELOG V2.9.2-2455