  2555   Wednesday, March 27, 2024, 09:49 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved to SHC from silo.

Tm3 has been moved to SHC from silo. the move is smooth.

  2623   Tuesday, June 25, 2024, 11:59 David WangITEStandard OperationTM3SiC #46Tm3 has been moved from TCS to ITE.

Tm3 has been moved from TCS to ITE. the move is smooth.

  2624   Tuesday, June 25, 2024, 11:59 David WangITEStandard OperationTM3SiC #46Tm3 has been moved from TCS to ITE.

Tm3 has been moved from TCS to ITE. the move is smooth.

  2576   Wednesday, May 01, 2024, 14:51 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved form TCS to SHC.

Travis and I moved TM3 from TCS to SHC this afternoon. The move is smooth.

  2586   Wednesday, May 08, 2024, 12:37 David WangITEStandard OperationTM3UCx#44Tm3 has been moved form TCS to ITE

The move is smooth and successful.

  2612   Friday, June 14, 2024, 11:56 David WangITEStandard OperationTM3UCx#44Tm3 has been moved form ITE to SHC.

Tm3 has been moved form ITE to SHC. the move is smooth.

  2686   Wednesday, September 18, 2024, 13:47 David WangSouth Hot-CellStandard OperationTM3TiC#8Tm3 has been moved from silo to SHC.

Tm3 has been moved  from silo to SHC. The move is smooth.

  2755   Tuesday, January 28, 2025, 11:47 David WangConditioning StationStandard OperationTM3No targetTm3 has been moved from TCS to silo.

Tm3 has been moved  from TCS to silo. The move is successful.

  2557   Thursday, March 28, 2024, 09:26 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved from SHC to silo.

Tm3 has been moved  from SHC to silo. The move is smooth.

  2693   Wednesday, September 25, 2024, 09:12 David WangSouth Hot-CellMaintenanceTM3 Tm3 has been moved from SHC to silo.

Tm3 has been moved  from SHC to silo. the move is smooth.

  2589   Friday, May 10, 2024, 09:04 David WangITEStandard OperationTM3UCx#44Tm3 has been connected in ITE.

Tm3 has been connected in ITE.  see attachment.

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer.pdf
Scanned_from_a_Xerox_Multifunction_Printer.pdf Scanned_from_a_Xerox_Multifunction_Printer.pdf Scanned_from_a_Xerox_Multifunction_Printer.pdf Scanned_from_a_Xerox_Multifunction_Printer.pdf
  2616   Tuesday, June 18, 2024, 11:59 David WangSouth Hot-CellStandard OperationTM3 Tm3 electrical check without target.

Tm3 electrical check without target is done. Everything is good including 2 x 5 pin connectors( all OL at 250 V to 60 KV and each other)  see attachment.

Attachment 1: TM3_without_target_2024_june_18.pdf
TM3_without_target_2024_june_18.pdf
  2621   Wednesday, June 19, 2024, 14:16 David WangSouth Hot-CellStandard OperationTM3SiC #46Tm3 electrical check with SiC#46 target at SHC

Tm3 electrical check with SiC#46 target  and HS line helium spray check at SHC. were done. everything is good. see attachment.

Attachment 1: TM3_with_SiC_46#_target_electrical_check_at_SHC.pdf
TM3_with_SiC_46#_target_electrical_check_at_SHC.pdf
  1108   Tuesday, October 20, 2015, 12:49 Dan McDonaldITWStandard Operation SiC#32Tm2 hook up In ITW

Lower and disconnect TM2 from crane in ITW, proceed with hooking up TM2 as per checklist with Anders. Double check flow meters and coils, reset TP1 and TP2

  2629   Wednesday, July 03, 2024, 14:01 David WangConditioning StationStandard OperationTM2 Tm2 has been moved from TCS to SW silo.

Tm2 has been moved from TCS to SW silo. the move is smooth.

  2626   Wednesday, June 26, 2024, 13:49 David WangConditioning StationStandard OperationTM2 Tm2 has been moved from SW silo to TCS.

Tm2 has been successfully moved from SW silo to TCS.

  2700   Tuesday, October 08, 2024, 11:46 David WangITEStandard OperationTM2Ta#68.Tm2 has been moved form SHC to ITE.

Tm2 has been moved form SHC to ITE. The move is smooth.

  2699   Tuesday, October 08, 2024, 11:45 David WangSouth Hot-CellStandard OperationTM2 Tm2 electrical check with Ta#68 installed at SHC.

ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR seals by Ferran.  during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal.  leak check and electrical check result are good after second time target installation. 

Attachment 1: TM2_Ta#68_electrical_check.pdf
TM2_Ta#68_electrical_check.pdf TM2_Ta#68_electrical_check.pdf
  1691   Tuesday, March 06, 2018, 09:53 David WangITWStandard OperationTM2 Tm2 and Tm4 vacuum disconnection

The job is done. See attachment.

Attachment 1: TM2_TM4_disconnection_Vacuum.pdf
TM2_TM4_disconnection_Vacuum.pdf TM2_TM4_disconnection_Vacuum.pdf
  2475   Wednesday, August 09, 2023, 13:13 David WangConditioning StationStandard OperationTM2Nb#10Tm2 Nb#10 has been connect at TCS.

TM2 Nb#10 has been connect at TCS. TCS water system and vacuum system have been started. Everything looks ok so far. TCS Faraday cage is secured for TM2 conditioning at TCS.