Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2623     Entry time: Tuesday, June 25, 2024, 11:59
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM3 
Target/Number: SiC #46 
Subject: Tm3 has been moved from TCS to ITE. 

Tm3 has been moved from TCS to ITE. the move is smooth.

ELOG V2.9.2-2455