Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2616     Entry time: Tuesday, June 18, 2024, 11:59
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: Tm3 electrical check without target. 

Tm3 electrical check without target is done. Everything is good including 2 x 5 pin connectors( all OL at 250 V to 60 KV and each other)  see attachment.

Attachment 1: TM3_without_target_2024_june_18.pdf  140 kB  | Show | Hide all
ELOG V2.9.2-2455