Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2621     Entry time: Wednesday, June 19, 2024, 14:16
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: SiC #46 
Subject: Tm3 electrical check with SiC#46 target at SHC 

Tm3 electrical check with SiC#46 target  and HS line helium spray check at SHC. were done. everything is good. see attachment.

Attachment 1: TM3_with_SiC_46#_target_electrical_check_at_SHC.pdf  72 kB  | Show | Hide all
ELOG V2.9.2-2455