Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1108     Entry time: Tuesday, October 20, 2015, 12:49
Author: Dan McDonald 
Category: ITW 
Type: Standard Operation 
Module:  
Target/Number: SiC#32 
Subject: Tm2 hook up In ITW 

Lower and disconnect TM2 from crane in ITW, proceed with hooking up TM2 as per checklist with Anders. Double check flow meters and coils, reset TP1 and TP2

ELOG V2.9.2-2455