ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  1428   Friday, January 27, 2017, 08:44 chad fisherSouth Hot-CellStandard OperationTM2Ta#50UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interferenceOn Tuesday, January 24th UCx#18 was removed
from TM2 and Ta febiad dummy installed. I
encountered the same issue mounting the new
 TM2_Waterline_interference.jpg 
  970   Tuesday, June 30, 2015, 12:37 chad fisherSouth Hot-CellStandard OperationTM1UCx#12UCx #12 RemovalUCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly
  
  2238   Wednesday, August 04, 2021, 17:24 David WangNorth Hot-CellStandard OperationTM2UCx34#UCX 34# on TM2 electical check and HS leak check at NHC.The job is done with Matt at NHC. All TGHT
and TBHT bolts are torque wrench tight in
NHC. HS leak check result is good.
 UCX34_TM2_electrical_check.pdf 
  2794   Thursday, April 24, 2025, 12:53 Aaron TamNorth Hot-CellStandard OperationTM4UC#48UC#48 IGLIS Install onto TM4C. Fisher, A. Schmidt, A. Tam
UC#48 Handover satisfactory

    Target taken out of glovebox
 Misaligned_target_leg.jpg86b48e1a-3507-4650-864b-841e638ab62e.jpg 
  2723   Tuesday, November 26, 2024, 14:52 Aaron TamSouth Hot-CellStandard OperationTM3UCx#47 UC#47 LP-SIS w/ gas Install November 26, 2024 - Aaron Tam 
Handover from TPO and inspection

    Completed
    Some
 6x 
  74   Monday, March 12, 2012, 10:03 chad fisherSouth Hot-CellStandard OperationTM1UC#3UC#3 RemovalUC#3 was removed from TM1 this morning.
Upon removing the oven heater bolts BOTH
legs fell demonstrating that both sides of
 IMG_0610.JPGIMG_0616.JPG 
  2063   Thursday, February 06, 2020, 13:31 Adam NewsomeSpent Target VaultStandard Operation UC#29UC#29 moved to vault location 6A, in pail 225 UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. 
  
  1913   Wednesday, May 01, 2019, 07:49 chad fisherSouth Hot-CellStandard OperationTM4UC#26UC#26 removalUC#26 has been removed from TM4.  20190501_072940[1].jpg 
  1566   Monday, June 26, 2017, 11:47 chad fisherSouth Hot-CellStandard OperationTM4Ta#52UC#20 Removed Ta#52 installedUC#20 has been removed from TM4 and put
in a bucket back-filled with argon. Ta#52
has been installed onto TM4 with new fasteners.
  
  1536   Tuesday, May 16, 2017, 13:23 chad fisherSouth Hot-CellStandard OperationTM4UC#20UC#20 InstalledUCx#19 has been removed from TM4 and UCx#20
installed.
UCx#19 still had water in it at pressure
  
  1296   Tuesday, August 02, 2016, 13:32 chad fisherSouth Hot-CellStandard OperationTM4UC#16UC#16 Removed #17 installedUCx#16 has been removed from TM$ and UCx#17
installed, high current conductors toqued
to 130 in lbs.
  
  894   Tuesday, April 21, 2015, 17:14 Isaac EarleSouth Hot-CellStandard OperationTM1UC#12UC#12 Installed in TM1On Friday April 17th, UC#12 target was
installed in TM1.  One of the copper
water lines was bent slightly as the target
 IMG_4836.JPGIMG_4833.JPG 
  1694   Thursday, March 08, 2018, 14:10 David WangITWMaintenance  Two small water leak has been found in ITW. Two small water leaks have been found on
ITW High active water system.  One is from
an unused 1/4" copper valve stem. another
  
  2419   Wednesday, March 01, 2023, 09:27 David WangCoolingMaintenance  Two filters on HALCW resin circuit have been replaced. Two filters on HALCW resin circuit have
been replaced. O-ring 235# were changed on
both filter cartridge houses.  25micron 
  
  2787   Tuesday, April 01, 2025, 09:47 Frank SongNorth Hot-CellRepair  Two NHC light bulbs replacement2 broken lights of NHC were replaced in
Target Hall. see pics attached.
 Image_(3).jpgImage_(4).jpgImage_(5).jpgImage_(6).jpgImage_(7).jpg 
  2312   Monday, April 04, 2022, 10:44 Nadia JorgensonSouth Hot-CellRepair  Turntable Chain Repair Last week we repaired
the South Hot Cell turntable chain/sprocket.
 Hot_Cell_Chain_1.jpgHot_Cell_Chain_2.jpg 
  1609   Tuesday, September 05, 2017, 06:33 David WangConditioning StationStandard OperationTM4 Turned off TCS water system and vacuum system.Argon vent and disconnect TM4 at TCS.   
  1580   Monday, July 10, 2017, 10:19 David WangConditioning StationStandard OperationTM4 Turned off TCS water systemPrepare for TM4 move tomorrow morning.   
  1080   Thursday, September 24, 2015, 07:00 David WangConditioning StationMaintenanceTM4Ta#46Turned off TCS all vacuum pumps and water pumps.TCS:MP1 back up pressure went up too high
(700mtorr).I turned off all the pumps.The
TCS is under vacuum still. TCS water 
  
  1143   Tuesday, December 01, 2015, 06:41 David WangConditioning StationStandard OperationTM4UC#14Turned off TCS all vacuum pumps and water pumps.I turned off TCS vacuum and water pumps.
The TSC and TM4 are still under vacuum condition.
  