Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2063
Entry time:
Thursday, February 06, 2020, 13:31
Author:
Adam Newsome
Category:
Spent Target Vault
Type:
Standard Operation
Module:
Target/Number:
UC#29
Subject:
UC#29 moved to vault location 6A, in pail 225
UC#29 in pail 225 was moved to the storage vault, location 6A. Field measured at 22.4 mSv/hr at ~1m.
ELOG V2.9.2-2455