Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1566     Entry time: Monday, June 26, 2017, 11:47
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#52 
Subject: UC#20 Removed Ta#52 installed 

UC#20 has been removed from TM4 and put in a bucket back-filled with argon. Ta#52 has been installed onto TM4 with new fasteners. High current torqued to 130 in lbs.

ELOG V2.9.2-2455