ID Date Author Category Typedown Module Target/Number Subject Text Attachments
  576   Monday, December 09, 2013, 13:15 Travis CaveSpent Target VaultStandard Operation Ta#41Spent target moveThe spent Ta#41 target has been moved from
the south hot cell to the spent target storage
vault. It is an unnumbered pail (should be
 Vault_Storage_December_9_2013.pdf 
  577   Monday, December 09, 2013, 14:47 David WangITEStandard OperationTM4 I moved 5 shielding blocks from block storage area to ITE.I moved 5 shielding blocks to ITE. The
ITE is configured to take proton beam.
  
  578   Thursday, December 12, 2013, 11:14 Bevan MossConditioning StationStandard OperationTM2 HV Chase Electrical TestWhile under vacuum Travis and I completed
diagnostics of the HV  chase. Majority of
the lines showed OL at 1kV but there were
  
  581   Monday, January 20, 2014, 13:35 David WangITEStandard OperationTM4 5 shielding blocks had been moved out of ITE5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF
ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND
ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR
  
  582   Monday, January 20, 2014, 13:38 David WangITEStandard OperationTM4 DISCONNECTED TM4 IN ITE.I DISCONNECTED TM4 IN ITE. ALL WATER LINES
HAD BEEN PURGED OUT WITH PRESSURE AIR.
  
  584   Monday, January 20, 2014, 14:37 Travis CaveITEStandard OperationTM4UC#8module moveTM#4 with UC#8 has been moved from the
east target station to the south hot cell.
  
  585   Tuesday, January 21, 2014, 14:32 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 has been moved from the south hot
cell to the north west silo.
  
  587   Wednesday, January 22, 2014, 15:00 Travis CaveSpent Target VaultStandard Operation UC#8Spent target moveUC#8 has been moved from the south hot
cell to the vault storage. It was placed
in pail 113 and placed in slot 8A of the
 Vault_Storage_January_22_2014.pdf 
  588   Wednesday, January 22, 2014, 15:20 Anders MjosSouth Hot-CellStandard Operation UC#8Target Inspection - post beamThe Target Assembly was inspected with
Chad, Jens Henning and Anders today.

    The Target Container was
  
  589   Thursday, January 30, 2014, 13:46 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 has been moved from the conditioning
station to the south hot cell.
  
  590   Monday, February 03, 2014, 14:45 Travis CaveSpent Target VaultStandard Operation  Spent targets to mini storage and the F-308s to the Target HallTargets NiO#1(101), Nb#5(85), TaC#1(92),
and ZrC#5(81) have been moved from the storage
vault and placed in the mini storage. The
 Vault_Storage_February_3_2014.pdfMini_Vault_Storage_February_3_2014.pdf 
  594   Wednesday, February 05, 2014, 14:12 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308sAll targets in the mini storage (4) have
been moved from there and placed into the
F-308s and those have been moved to the mech
  
  603   Thursday, February 20, 2014, 09:45 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 has been moved from the conditioning
station to the south hot cell.
  
  607   Monday, February 24, 2014, 13:52 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moveTM#2 moved from the south hot cell to the
conditioning station.
  
  610   Tuesday, March 04, 2014, 10:19 Travis CaveITEStandard OperationTM3no targetmodule moveTM#3 has been moved from the silo to the
east target station.
  
  611   Wednesday, March 05, 2014, 10:07 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 with no target or source tray has
been moved from the conditioning station
to the north east silo. TM#1 with no target
  
  615   Thursday, March 06, 2014, 14:12 David WangConditioning StationStandard OperationTM1 TM1 air to vacuum and water lines leak check at CS.TM1 air to vacuum and water lines leak
check at CS are finished this afternoon.
The leak detector  is hooked directly
 8x 
  616   Friday, March 07, 2014, 12:45 David WangITEStandard OperationTM3 TM3 and ITE air to vacuum leak check and TM3 water lines helium test.With TM3 located in ITE, All air to vacuum
seals  on ITE primary and secondary
vacuum vessel have been leak  checked
 001.JPG002.JPG003.JPG010.JPG013.JPG 
  617   Monday, March 10, 2014, 09:39 Travis CaveITEStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the east target station to the south west
silo.
  
  619   Wednesday, March 12, 2014, 09:45 Travis CaveITWStandard OperationTM4no targetmodule moveTM#4 has been moved from the north west
silo to the west target station.
  