The Target Assembly was inspected with Chad, Jens Henning and Anders today.
- The Target Container was broken.
- Material was deposited on the Heat Shield around the Target Center Block
- Material was deposited on the IG-LIS source.
- Electrical checks to ground (HS)
- The Extraction Electrode passed the electrical check at 1000V
- The Exit Electrode (c) held only 40V at 22 kOhm
- The IG Electrode 1 (f) held 250V at 390 MOhm
- The IG Electrode 2 (g) held only 40V at 22 kOhm
- IG 1 and IG 2 both held 250V at 450 MOhm to Exit Electorde (c)
- No spark marks were observed on the 9-pin connector
See photos of the inspection on DocuShare |