ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
396
|
Thursday, July 04, 2013, 11:37 |
David Wang | ITW | Standard Operation | TM1 | UCx | I reconnected TM1 to ITW. | I reconnected TM1 to ITW on
02 July.The pumping down is good so far.
TM1 water interlock check is good also. |
|
|
399
|
Tuesday, July 09, 2013, 14:26 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks had been transferred from ITE to ITW | 5 shielding blocks had been transferred
from ITE to ITW. The ITW is configured
to take proton beam. |
|
|
447
|
Wednesday, September 11, 2013, 09:35 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks have been moved to ITW | I moved 5 shielding blocks to ITW this
morning .I checked the water signals in electrical
room before the moving, and everything is |
|
|
851
|
Monday, March 02, 2015, 10:52 |
David Wang | ITE | Maintenance | TM4 | UCx | ITE primary and secondary vacuum vessels leak check. | Dan and I leak checked ITE primary and
secondary vacuum vessels with TM4 in
ITE. The leak detector was hooked to ITE |
|
|
2713
|
Wednesday, November 06, 2024, 16:33 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCX46 | TM4 with UCx46 electrical and leak check at SHC | TM4 with UCx46 electrical and leak check
at SHC is done. Everything is good. |
|
|
2739
|
Friday, January 03, 2025, 10:41 |
David Wang | ITW | Standard Operation | TM4 | UCX46 | ITW primary and secondary vacuum vessel leak check for 2025 shut down | ITW primary and secondary vacuum vessel
leak check for 2025 shut down has been
done. Also,TM4 internal water line helium |
|
|
2336
|
Wednesday, June 22, 2022, 09:03 |
David Wang | ITE | Standard Operation | TM4 | UCX37# P2N | Remotely removed TM2 from ITE to NHC | TM2 with UCx#37 P2N target was removed
from ITE to NHC yesterday morning. The move
is good. |
|
|
2225
|
Wednesday, June 09, 2021, 10:15 |
David Wang | ITE/ITW | Standard Operation | TM4 | UCX33. | ITE water signal interlock check. | Annual ITE water signal interlock check
is done. HS, TAR, TUBE, MSP, EE, COIL
1, containment box window, HVC1, HVC2, 2A |
|
|
2228
|
Friday, June 11, 2021, 10:36 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCX33# | TM2 leak check at TCS | Leak checked TM2 service cap at TCS. helium
pressure checked containment box window and
HS cooling lines. No leak on service |
|
|
2229
|
Tuesday, June 22, 2021, 15:35 |
David Wang | ITW | Standard Operation | TM2 | UCX33# | TM2 has been connected it ITW. | TM2 has been connected it ITW. All
turbo pumps are started. |
|
|
2221
|
Thursday, June 03, 2021, 08:19 |
David Wang | ITE | Repair | TM4 | UCX33 | Replaced ITE TP4 | Replaced ITE TP4 due to failure start.
The new pump works fine. |
|
|
2227
|
Thursday, June 10, 2021, 14:54 |
David Wang | North Hot-Cell | Standard Operation | TM2 | UCX33 | UCX 33 on TM2 electical check at NHC. | TM2 UCX33# electrical check and leak check
results. See attachment. |
|
|
2223
|
Thursday, June 03, 2021, 08:33 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCX32# P2N | P2N UCX 32 on TM4 electical check and leak check at SHC. | Both electrical check and leak check (HS
and Window lines)results are good.
See attachments |
|
|
1985
|
Friday, September 13, 2019, 13:36 |
David Wang | ITW | Standard Operation | TM4 | UCX27 | TM4 conenction in ITW checklist | TM4 was connected in ITW this Tuesday.
See attachment for checklist. |
|
|
196
|
Tuesday, October 16, 2012, 07:14 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCX#5 | TM4 heat shield helium pressure test and electrical check at CS | TM4 heat shield helium pressure test and
electrical check were done at CS
last week. The results are good. NO leak |
|
|
220
|
Tuesday, December 04, 2012, 13:33 |
David Wang | ITE | Standard Operation | TM4 | UCX#5 | Disconnected TM4 in ITE. | I disconnected TM4 in ITE. All water lines
had been purged.Travis was with me . |
|
|
2263
|
Tuesday, November 09, 2021, 14:35 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | UCX#36 | Module Move | TM#2 was moved from ITW to SHC,
then moved back to ITW. |
|
|
2011
|
Wednesday, October 23, 2019, 06:56 |
David Wang | ITW | Standard Operation | TM4 | UCX 28 | TM4 UCx 28 disconnection checklist | TM4 was disconnected in ITW. See
checklist. |
|
|
676
|
Tuesday, June 03, 2014, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | TM1 HS line helium pressure test and TM1 electrical check at CS | TM1 HS line helium pressure test and TM1
electrical check at CS under vacuum are finished.
Everything is good. See attachment |
7x |
|
677
|
Monday, June 09, 2014, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | Stop TM1 and CS trubo pumps and ruff pump. | The CS and TM1 is still under vacuum. They
will be vented with argon tomorrow mornig |
|