  RH-ISAC, Page 21 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Module Target/Numberdown Subject
  396   Thursday, July 04, 2013, 11:37 David WangITWStandard OperationTM1UCxI reconnected TM1 to ITW.

 I  reconnected TM1 to ITW on 02 July.The pumping down is good so far. TM1 water interlock check is good also.

  399   Tuesday, July 09, 2013, 14:26 David WangITWStandard OperationTM1UCx5 shielding blocks had been transferred from ITE to ITW

5 shielding blocks had been  transferred from ITE to ITW.  The  ITW is configured to take proton beam.

  447   Wednesday, September 11, 2013, 09:35 David WangITWStandard OperationTM1UCx5 shielding blocks have been moved to ITW

I moved 5 shielding blocks to ITW this morning .I checked the water signals in electrical room before the moving, and everything is fine. The argon venting systemin ITW and electrical room is ready also.

  851   Monday, March 02, 2015, 10:52 David WangITEMaintenanceTM4UCxITE primary and secondary vacuum vessels leak check.

Dan and I leak checked ITE primary and secondary vacuum vessels with TM4  in ITE. The leak detector was hooked to ITE TP2 BV2. Leak detector  base leak rate: 0.0xE-09 atm.cc/sec, base pressure: 0.0xE-4 torr. All secondary vacuum vessel seals has been checked(helium spray), and no leak has been found. On the ITE primary vacuum vessel, we  leak checked every thing except the TM4 service cap and water lines inside the TM4. NO leak has been found on ITE primary vessels. The primary vacuum seals on TM4 service cap and TM4 waterlines(helium pressure test) will be checked at CS later.

  2713   Wednesday, November 06, 2024, 16:33 David WangSouth Hot-CellStandard OperationTM4UCX46TM4 with UCx46 electrical and leak check at SHC

TM4 with UCx46 electrical and leak check at SHC is done. Everything is good.

Attachment 1: TM4_UCx46_electrical_check.pdf
TM4_UCx46_electrical_check.pdf TM4_UCx46_electrical_check.pdf
  2739   Friday, January 03, 2025, 10:41 David WangITWStandard OperationTM4UCX46ITW primary and secondary vacuum vessel leak check for 2025 shut down

ITW primary and secondary vacuum vessel leak check for  2025 shut down has been done. Also,TM4 internal water line helium pressure test has been finished.  Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate  o-ring under 1Xe-8 atm.cc/sec which we knoew in past years test. resin spray on leak  area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak.   See attachment  for detail results.

Attachment 1: ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
ITW_primary_and_secondary_vacuum_leak_check_2025.pdf ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
  2336   Wednesday, June 22, 2022, 09:03 David WangITEStandard OperationTM4UCX37# P2NRemotely removed TM2 from ITE to NHC

TM2 with UCx#37 P2N target  was removed from ITE to NHC yesterday morning. The move is good.

  2225   Wednesday, June 09, 2021, 10:15 David WangITE/ITWStandard OperationTM4UCX33. ITE water signal interlock check.

Annual ITE water signal interlock check is done.  HS, TAR, TUBE, MSP, EE, COIL 1, containment box window, HVC1, HVC2, 2A window, 2A  shielding plug, 2A dump, 2A collimator, and 2A tank water signal interlock are checked.   Everything is working properly.  

2021-06-22. Annual ITW water signal interlock check is done,  HS, TAR, MSP,  EE, COIL1 , containment box window, HVC1 , HVC2, 2A window, 2A shielding plug, 2A dump, 2A collimator, and 2A tank water signal interlock are checked. Everything works fine.

  2228   Friday, June 11, 2021, 10:36 David WangConditioning StationStandard OperationTM2UCX33#TM2 leak check at TCS

Leak checked TM2 service cap at TCS. helium pressure checked containment box window and HS cooling lines.  No leak on service cap and waterlines.

  2229   Tuesday, June 22, 2021, 15:35 David WangITWStandard OperationTM2UCX33#TM2 has been connected it ITW.

TM2 has been connected it ITW.  All turbo pumps are started.

  2221   Thursday, June 03, 2021, 08:19 David WangITERepairTM4UCX33Replaced ITE TP4

Replaced  ITE TP4 due to failure start. The new pump works fine.

  2227   Thursday, June 10, 2021, 14:54 David WangNorth Hot-CellStandard OperationTM2UCX33 UCX 33 on TM2 electical check at NHC.

TM2 UCX33# electrical check and leak check results. See attachment.

Attachment 1: UCX33_TM2_electrical_check.pdf
UCX33_TM2_electrical_check.pdf UCX33_TM2_electrical_check.pdf
  2223   Thursday, June 03, 2021, 08:33 David WangSouth Hot-CellStandard OperationTM4UCX32# P2NP2N UCX 32 on TM4 electical check and leak check at SHC.

Both electrical check and leak check (HS and Window lines)results are good.   See attachments

Correction: It should be UCx#32 P2N instead of UCx33# in check list attached . UCx#33 is on TM2 in ITW

Attachment 1: P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf
P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf
  1985   Friday, September 13, 2019, 13:36 David WangITWStandard OperationTM4UCX27TM4 conenction in ITW checklist

TM4 was connected in ITW this Tuesday. See attachment for checklist.

Attachment 1: TM4_UCx27_connection_checklist.pdf
TM4_UCx27_connection_checklist.pdf TM4_UCx27_connection_checklist.pdf TM4_UCx27_connection_checklist.pdf
  196   Tuesday, October 16, 2012, 07:14 David WangConditioning StationStandard OperationTM4UCX#5TM4 heat shield helium pressure test and electrical check at CS

TM4 heat shield helium pressure test and electrical check were done  at CS  last week. The results are good. NO leak had been found on heat shield circuit.The electrical check is also good.

  220   Tuesday, December 04, 2012, 13:33 David WangITEStandard OperationTM4UCX#5Disconnected TM4 in ITE.

I disconnected TM4 in ITE. All water lines had been purged.Travis was with me .

  2263   Tuesday, November 09, 2021, 14:35 Adam NewsomeSouth Hot-CellStandard OperationTM2UCX#36Module Move

TM#2 was moved from ITW to SHC, then moved back to ITW.

  2011   Wednesday, October 23, 2019, 06:56 David WangITWStandard OperationTM4UCX 28TM4 UCx 28 disconnection checklist

TM4 was disconnected in ITW.  See checklist.

Attachment 1: UCx_28_disonnection_CL.pdf
UCx_28_disonnection_CL.pdf UCx_28_disonnection_CL.pdf
  676   Tuesday, June 03, 2014, 09:12 David WangConditioning StationStandard OperationTM1UC9#TM1 HS line helium pressure test and TM1 electrical check at CS

TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment

Attachment 1: 001.JPG
001.JPG
Attachment 2: 002.JPG
002.JPG
Attachment 3: 003.JPG
003.JPG
Attachment 4: 004.JPG
004.JPG
Attachment 5: 005.JPG
005.JPG
Attachment 6: 006.JPG
006.JPG
Attachment 7: TM1_UC9#_E-check_at_CS.pdf
TM1_UC9#_E-check_at_CS.pdf
  677   Monday, June 09, 2014, 10:33 David WangConditioning StationStandard OperationTM1UC9#Stop TM1 and CS trubo pumps and ruff pump.

The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig