2457
|
Tuesday, June 13, 2023, 11:49 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | electrical check and leak check |
TM4 with new target SiC#45 installed has been leak checked and electrical checked on top of NHC. |
Attachment 1: TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png
|
|
|
2165
|
Wednesday, November 18, 2020, 15:28 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Nb#6 | electrical check and HS leak check. |
Everything looks good. A still short to P before target installation. We will float P,Q as before on module top. |
Attachment 1: Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png
|
|
|
2362
|
Tuesday, September 06, 2022, 14:05 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check after disconnection |
An electrical was done on the NHC for TM2 with spent Target UCx#38 on |
Attachment 1: TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
|
|
|
2632
|
Thursday, July 04, 2024, 13:23 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | electrical check on TM4 UCx#45 target at SHC after operation. |
electrical check on TM4 UCx#45 target at SHC after operation is done. see attachment. |
Attachment 1: Tm4_UCx_46_at_SHC_after_operatiom.pdf
|
|
|
2321
|
Wednesday, May 18, 2022, 13:52 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check |
The TM4 with installed target #UCx37 had been electric checked at SHC. PICs attached. |
Attachment 1: 1.jpg
|
|
Attachment 2: 2.jpg
|
|
Attachment 3: 3.jpg
|
|
|
2484
|
Tuesday, August 29, 2023, 10:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check |
TM4 with spent target UCx#42 has been electric checked at NHCpost right after transferred from ITE. |
Attachment 1: TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf
|
|
|
2264
|
Wednesday, November 10, 2021, 08:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | UC#36 | electrical check |
An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. |
Attachment 1: IMG_4322.JPG
|
|
|
2331
|
Monday, June 20, 2022, 18:03 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Sic#43 | electrical check |
TM2 with new target SiC#43 was electrical checked at SHC. please see attachment. |
Attachment 1: TM2_with_SiC43.jpg
|
|
|
2335
|
Tuesday, June 21, 2022, 18:43 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check |
A p2n target in TM4 was electrical measured on NHC. see attachment pls. |
Attachment 1: p2n_ucx37_electrical_check.jpg
|
|
|
2338
|
Thursday, June 23, 2022, 07:11 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#64 | electrical check |
New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment. |
Attachment 1: Ta#64.jpg
|
|
|
2347
|
Tuesday, July 19, 2022, 11:53 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | SiC#43 Febiad | electrical check |
A electrical check was done at NHC, see the pic attached with please. |
Attachment 1: e_check_for_TM2_with_SiC43_Febiad.jpg
|
|
|
2348
|
Thursday, July 21, 2022, 10:24 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check |
A electrical check was done for TM2 with UCx#38 |
Attachment 1: TM2_with_UCx38_echeck_on_NHC.jpg
|
|
|
2363
|
Thursday, September 08, 2022, 07:20 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check |
An electrical check was done on NHC yesterday. |
Attachment 1: TM2_with_UCx#39_E_Check.png
|
|
|
2373
|
Tuesday, October 04, 2022, 07:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#4 | electrical check |
an electrical was done for TM4 with target C#4 installed on NHC. |
Attachment 1: tm4_with_C#4_installed.png
|
|
|
2382
|
Tuesday, November 01, 2022, 12:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check |
TM2 with spent target UCx#39 had an electric check in NHC.
After UCx 39# target was removed out., I did electrical check on TM2. @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm. A to P is still short. |
Attachment 1: electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
|
|
|
2383
|
Wednesday, November 02, 2022, 11:11 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#40 | electrical check |
an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS. |
Attachment 1: TM2_with_UCx40_electrical_check_on_NHC.png
|
|
|
2390
|
Tuesday, November 22, 2022, 12:41 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#4 | electrical check |
TM4 with C#4 is checked on NHC right after moving from ITE. |
Attachment 1: TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
|
|
|
2456
|
Tuesday, June 13, 2023, 11:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check |
TM4 with spent target TiC#5 electric check after moving from ITE to NHC. |
Attachment 1: TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png
|
|
|
2466
|
Wednesday, July 19, 2023, 08:09 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check |
An electrical check was made after new target installed on TM4. |
Attachment 1: E__check_after_UCx42_installed_on_TM4.pdf
|
|
|
2481
|
Tuesday, August 29, 2023, 09:07 |
Frank Song | ITW | Repair | TM2 | Nb#11 | electrical check |
TM2 with new target Nb#11 replaced has been electric checked one more time in ITW. |
Attachment 1: TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf
|
|