Entry  Tuesday, June 13, 2023, 11:49, Frank Song, North Hot-Cell, Standard Operation, TM4, SiC#45, electrical check and leak check TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png

 TM4 with new target SiC#45 installed has been leak checked and electrical checked on top of NHC.

Entry  Wednesday, November 18, 2020, 15:28, David Wang, South Hot-Cell, Standard Operation, TM2, Nb#6, electrical check and HS leak check. Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png

Everything looks good. A still short to P before target installation. We will float P,Q as before on module top.

Entry  Tuesday, September 06, 2022, 14:05, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check after disconnection  TM2_electrical_check_on_NHC_with_spent_UCx38_on.png

 An electrical was done on the NHC for TM2 with spent Target UCx#38 on

Entry  Thursday, July 04, 2024, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, electrical check on TM4 UCx#45 target at SHC after operation.  Tm4_UCx_46_at_SHC_after_operatiom.pdf

electrical check  on TM4 UCx#45 target at SHC after operation is done.   see attachment.

Entry  Wednesday, May 18, 2022, 13:52, Frank Song, South Hot-Cell, Standard Operation, TM4, UCx#37, electrical check  1.jpg2.jpg3.jpg

 The TM4 with installed target #UCx37 had been electric checked at SHC. PICs attached.

Entry  Tuesday, August 29, 2023, 10:45, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#42, electrical check  TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf

  TM4 with spent target UCx#42 has been electric checked at NHCpost right after transferred from ITE.

Entry  Wednesday, November 10, 2021, 08:29, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36, electrical check IMG_4322.JPG

 An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. 

Entry  Monday, June 20, 2022, 18:03, Frank Song, South Hot-Cell, Standard Operation, TM2, Sic#43, electrical check TM2_with_SiC43.jpg

 TM2 with new target SiC#43 was electrical checked at SHC. please see attachment.

Entry  Tuesday, June 21, 2022, 18:43, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#37, electrical check p2n_ucx37_electrical_check.jpg

 A p2n target in TM4 was electrical measured on NHC. see attachment pls.

Entry  Thursday, June 23, 2022, 07:11, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#64, electrical check Ta#64.jpg

 New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment.

Entry  Tuesday, July 19, 2022, 11:53, Frank Song, North Hot-Cell, Standard Operation, TM2, SiC#43 Febiad, electrical check e_check_for_TM2_with_SiC43_Febiad.jpg

 A electrical check was done at NHC, see the pic attached with please.

Entry  Thursday, July 21, 2022, 10:24, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check TM2_with_UCx38_echeck_on_NHC.jpg

 A electrical check was done for TM2 with UCx#38

Entry  Thursday, September 08, 2022, 07:20, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check TM2_with_UCx#39_E_Check.png

 An electrical check was done on NHC yesterday.

Entry  Tuesday, October 04, 2022, 07:19, Frank Song, North Hot-Cell, Standard Operation, TM4, C#4, electrical check tm4_with_C#4_installed.png

 an electrical was done for TM4 with target C#4 installed on NHC.

Entry  Tuesday, November 01, 2022, 12:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png

 TM2 with spent target UCx#39 had an electric check in NHC.

After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm.  A to P is still short.

Entry  Wednesday, November 02, 2022, 11:11, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#40, electrical check TM2_with_UCx40_electrical_check_on_NHC.png

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

Entry  Tuesday, November 22, 2022, 12:41, Frank Song, North Hot-Cell, Standard Operation, TM4, C#4, electrical check TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png

 TM4 with C#4 is checked on NHC right after moving from ITE.

Entry  Tuesday, June 13, 2023, 11:45, Frank Song, North Hot-Cell, Standard Operation, TM4, TiC#5, electrical check TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png

 TM4 with spent target TiC#5 electric check after moving from ITE to NHC.

Entry  Wednesday, July 19, 2023, 08:09, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#42, electrical check E__check_after_UCx42_installed_on_TM4.pdf

 An electrical check was made after new target installed on TM4.

Entry  Tuesday, August 29, 2023, 09:07, Frank Song, ITW, Repair, TM2, Nb#11, electrical check TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf

 TM2 with new target Nb#11 replaced has been electric checked one more time in ITW.