876
|
Friday, March 27, 2015, 11:29 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 is connected at CS | TM4 has been connected at CS which includes
high current cables, water lines, EE cable,
and Enizel lens cable. The HV cover has been |
|
877
|
Monday, March 30, 2015, 07:38 |
David Wang | ITE | Standard Operation | TM4 | | TH Shut Down Activities Schedule Feb 23th- Apr 15th update | Updated schedule this morning after last
Fridays ISAC facility support group meeting.
Updated schedule on 2015-April -02. |
|
878
|
Monday, March 30, 2015, 09:03 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | Ta#45 | Ta#45 Conditionoing | Monday, March 30, 2015, 08:59: Reset chiller
by switching on off power (fault 2)
Monday, March 30, 2015, 09:02: Switched |
|
880
|
Wednesday, April 01, 2015, 06:56 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 has been disconnected at CS. | TM4 has been disconnected at CS. The CS
and TM4 is venting for move. Anders stopped
vacuum and water system yesterday. |
|
881
|
Wednesday, April 01, 2015, 10:52 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module move | TM#4 with Ta#45 has been moved from the
conditioning station to the east target station. |
|
882
|
Wednesday, April 01, 2015, 13:08 |
David Wang | ITE | Standard Operation | TM4 | | Replaced ITE tank to module 42X0.275 o-ring | I replaced ITE tank to module 42 ID X 0.275
o-ring. The o-ring is changed once a year
before the first beam time. The flanges was |
|
883
|
Wednesday, April 01, 2015, 13:12 |
David Wang | ITE | Standard Operation | TM4 | Ta#45 | TM4 has been connected in ITE | TM4 has been connected in ITE. ITE six
turbo-pumps have been started. So far so
good. |
|
884
|
Friday, April 10, 2015, 15:40 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 shielding blocks have been transferred
to ITE. The ITE is configured to take proton
beam. |
|
890
|
Monday, April 20, 2015, 07:27 |
David Wang | ITE | Standard Operation | TM4 | | Target Hall Scheduled Activities April 07 - June 26 2015 | Weekly target hall schedule update.2015-04-20
weekly target hall schedule update
2015-04-27 attachments 3,4. |
|
921
|
Monday, June 01, 2015, 11:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module moved | TM#4 with Ta#45 has been moved from the
east target station to the south hot cell. |
|
922
|
Monday, June 01, 2015, 14:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical Check | Post beam electrical check on the Ta#45
target installed on TM#4. See attached PDF. |
|
923
|
Tuesday, June 02, 2015, 06:51 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Target Hall Scheduled Activities April 07 - June 26 2015 | Target Hall schedule weekly update. All
jobs are finished on time so far. |
|
924
|
Tuesday, June 02, 2015, 09:43 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 | SiC#31 installed | Ta #45 has been removed from TM4 and SIC#31installed. |
|
925
|
Tuesday, June 02, 2015, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#31 | Electrical Check | Electrical check on TM#4 with SiC#31. See
attached PDF for details. |
|
926
|
Tuesday, June 02, 2015, 11:54 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#31 | Module moved | TM#4 with SiC#31 has been moved from the
south hot cell to the conditioning station. |
|
927
|
Tuesday, June 02, 2015, 14:32 |
David Wang | South Hot-Cell | Standard Operation | TM4 | SiC #31 | Leak check on TM4 HS water line with new SiC #31 target. at SHC | Chad and I leak checked TM4 HS water line
with SiC #31 target installed. leak rate:0.0xE-9atm.cc/sec.
No leak. The line will be helium pressurized |
|
928
|
Tuesday, June 02, 2015, 14:38 |
David Wang | Conditioning Station | Repair | TM4 | | replace broken TM4 IG1 | TM4 IG1 filament was broken during
last run at ITE. The broken filament
is replaced with a new one today when TM4 |
|
929
|
Tuesday, June 02, 2015, 14:39 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #31 | TM4 and CS turbo- pumps are started . | TM4 and CS turbo-pumps are started this
afternoon. Everything is good so far. |
|
931
|
Wednesday, June 03, 2015, 13:01 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#31 | Conditioning SiC#31 | PNG1 connected to PNG in service cap
(as per David W)
Wednesday, June 03, 2015, 12:59: |
|
932
|
Wednesday, June 03, 2015, 13:51 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #31 | TM4 is connected at CS | TM4 has been connected at CS. CS HV cover
is installed.I made a pair of new cooling
lines for TM window cooling at CS. The TM4 |
|