Message ID: 2768     Entry time: Friday, February 14, 2025, 10:43
Author: David Wang 
Category: ITW/ITE 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: target pit CAD filter replacement in TH.  

Plant Group Gabril.T organized a target pit CAD filter replacement and testing yesterday. My group helped on this job.  small 3T hoist was used for the job.Still the filter needs to be pushed manually on crane to south into position because of crane access limit on south.  The replacement job went well. Later, Gabril reported his test result is good as well.

 