2619
|
Wednesday, June 19, 2024, 08:10 |
David Wang | Waste Package/Ship | Development | | | 5 gallon spent target pail, spent target lifting long pole and hook assembly load test | 5 gallon spent target pail, lifting
long pole and hook assembly load test was
done by Rupan, Keyur ,and David. Load |
|
783
|
Thursday, November 06, 2014, 08:55 |
David Wang | ITW | Repair | TM1 | ThO#1 | primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. | I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20 |
|
2098
|
Thursday, June 04, 2020, 10:40 |
David Wang | Conditioning Station | Maintenance | | | Three manual valves are closed on TCS water system | Three manual valves are closed on TCS water
system return line in experimental hall.
See attachments. It is for TCS TK2 water |
 |
873
|
Wednesday, March 25, 2015, 14:34 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 and CS turbo- pumps are started . | I connected TM4 and CS vacuum system after
TM4 move. CS roughing pump was started first
this morning. Later, Anders, Bill and I started |
|
1316
|
Thursday, August 11, 2016, 10:37 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 service tray cover plate ITA2108 has been removed. | Requested by Aurelia, and approved by Friedhelm,
TM3 service tray cover plate ITA2108 has
been remove out of the module. The plated |
|
695
|
Friday, June 27, 2014, 10:16 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TM3 HS water lines helium pressure test. at CS | TM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 |
|
1185
|
Wednesday, March 30, 2016, 15:49 |
David Wang | Assembly/Bench Test | Repair | TM2 | | TM2 Helium spray leak check on solder stems inside service cap on the top of SW silo. | On each water circuit in side the service
cap, there are 4 soldering stems which two
of them are inside blue nylon insulator and |
7x |
735
|
Wednesday, September 03, 2014, 10:50 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been disconnected in ITW. | TM1 has been disconnected in ITW. |
|
678
|
Tuesday, June 10, 2014, 07:57 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#9 | TM1 are vented with argon and disconnected at CS. | TM1 will be moved to ITW this morning. |
|
574
|
Thursday, December 05, 2013, 14:57 |
David Wang | ITE | Standard Operation | TM4 | | Connected TM4 in ITW | I connected TM4 in ITE. All turbo pumps
have been started and wok fine including
new TP3. Everything is good so far. |
|
1322
|
Tuesday, August 16, 2016, 12:35 |
David Wang | Conditioning Station | Repair | TM3 | | CS vacuum pumps have been stopped | The TCS is venting now. The TM3 blue insulator
replacement job will be started soon. |
|