Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1461     Entry time: Friday, March 24, 2017, 11:12
Author: Keith C Ng 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: 2A window transfer 

Transfered the 2A window from the ISAC Storage Vault to the Cyclotron Vault Tunnel Storage area. RPG storage form attached.

Attachment 1: 2017mar24_vault_tunnel_storage_form(1).pdf  106 kB  | Show | Hide all
ELOG V2.9.2-2455