2727
|
Tuesday, December 03, 2024, 12:28 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM3 move - TCS to ITE | TM3 was moved with UCx#47 from TCS to ITE.
The move was smooth. |
|
2731
|
Wednesday, December 04, 2024, 10:40 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - SHC to silo | TM2 was remotely moved from the South Hot
Cell to SW Silo. Reading at SHC = 89.8 mSv/h.
The move was smooth. |
|
2734
|
Thursday, December 05, 2024, 12:00 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#68 | Spent target move - Ta#68 in Pail 300 | Ta#68 spent target was moved in Pail 300
to storage vault location 5A. The dose rate
measured at the South Hot Cell was 429 mSv/h |
|
2736
|
Wednesday, December 18, 2024, 12:18 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Five Pails Transferred from Main Vault to Mini Vault | Five pails were transferred from main vault
to mini vault. Note that there was already
one pail in the mini vault, so at present |
|
2737
|
Wednesday, December 18, 2024, 14:17 |
Adam Newsome | Pail Handling Tool | Maintenance | | | Pail Handling Tool - Inspection | An informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main |
|
2738
|
Friday, January 03, 2025, 09:59 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
2751
|
Monday, January 20, 2025, 11:33 |
Adam Newsome | Waste Package/Ship | Standard Operation | | | F-308 flask loading - six flasks loaded | Today (2025-01-20), six flasks were loaded
in preparation for shipment with the following
targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, |
|
2655
|
Monday, August 12, 2024, 15:55 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 LP-SIS | Target Loading | Ta#67 Target loaded onto TM2
Leak check passed
Electrical test passed after loosening |
|
2659
|
Wednesday, August 14, 2024, 11:29 |
Aaron Tam | Waste Package/Ship | Standard Operation | | SiC#46 | Target Disposal and visual check | SiC#46 loaded into pail 293 successfully
along with other hotcell waste
Upon visual inspection of the target, |
|
2663
|
Friday, August 16, 2024, 15:28 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#7 HP-FEBIAD | TiC#7 Target Removed from TM4 | TiC#7 Target Removed from TM4. -
Photos attached
TiC#7 Currently sitting in SHC waiting |
|
2664
|
Friday, August 16, 2024, 15:32 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | Ta#68 LP-SIS | Target Ta#68 loaded onto TM4 | Target Ta#68 loaded onto TM4
-leak check passed
-Target electrode conductor screws |
|
2675
|
Friday, September 06, 2024, 14:28 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68(Spare) | Ta#68(Spare) removed from TM4 and into Anteroom | September 5, 2024 -AT
Plastic and clean target
tray added to SHC
TM4 |
|
2676
|
Tuesday, September 10, 2024, 12:41 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target TiC#9 HP-SIS installed onto TM4 | September 9, 2024 - Aaron Tam
Water from waterline found
puddled on source-tray and containment box.
|
|
2685
|
Wednesday, September 18, 2024, 13:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Target removal | TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under |
13x |
2690
|
Monday, September 23, 2024, 16:06 |
Aaron Tam | South Hot-Cell | Repair | TM3 | | Insulator Addition to Water block | September 23, 2024 - C. Fisher
Containment box removed
Insulator installed
New |
|
2697
|
Tuesday, October 01, 2024, 12:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Target Ta#67 Removed from TM2 | October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting |
9x |
2698
|
Tuesday, October 08, 2024, 11:20 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 install onto TM2, w/ Troubleshooting | October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into |
17x |
2702
|
Thursday, October 10, 2024, 10:24 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Ta#67 PIE | Post Irradiation Examination
October 9, 2024 - Aaron Tam w/
Chad Fisher, Aurelia Laxdal, and Lucas Backes |
35x |
2703
|
Thursday, October 10, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 PIE | Post Irradiation Examination
|
32x |
2705
|
Friday, October 11, 2024, 15:59 |
Aaron Tam | Facilities | Repair | | | ISAC B2 North Hot Cell Phone Fixed | Resolution comment / Commentaire
de résolution:
|
|