The annual inspection of the mini-storage vault was performed today. The following items were checked:
- Cabling and cable management
- Connectors
- Controls box - internal wiring and components, functionality
- Limit switches - functionality, wiring, mounting
- Motor
- Bearings
- Set screws
- Miscellaneous fasteners (some loose, but were tightened)
Everything appears to be in good working order.
Note: in the near future, the bearings should be greased. This is planned to take place during the next inspection of the main storage vault. |