2172
|
Thursday, December 10, 2020, 15:07 |
Adam Newsome | South Hot-Cell | Development | TM3 | | TM3 Move | TM3 was remotely moved from the conditioning
station to the South Hot Cell. No containment
box. |
|
2174
|
Thursday, December 24, 2020, 09:00 |
Matthew Gareau | North Hot-Cell | Development | | | NHC USB connection | |
|
2175
|
Monday, January 04, 2021, 12:13 |
Adam Newsome | Conditioning Station | Development | TM3 | | TM3 Move | TM3 was remotely moved from the
South Hot Cell to the conditioning station.
No containment box. |
|
2183
|
Wednesday, January 27, 2021, 14:30 |
David Wang | Cooling | Development | | | High active water system purging | High active water are purged to holding
tank at B2 level. There should be around
48 gallons are purged out of system. No purging |
|
2188
|
Tuesday, February 16, 2021, 14:00 |
Adam Newsome | Crane | Development | | | Crane pendant upgrade | The crane pendant for the main hoist was
upgraded to a FLEX EX2 style pendant by Canco
Cranes. The installation work was performed |
|
2196
|
Thursday, March 04, 2021, 16:30 |
Isaac Earle | North Hot-Cell | Development | | | NHC gas delivery lines leak checked | The North Hot Cell gas delivery lines
(labeled 1, 2, and 3 on the hot and cold
side panels) were leak checked today. |
|
2197
|
Friday, March 05, 2021, 09:12 |
Matthew Gareau | North Hot-Cell | Development | TM3 | | Containment box door removal and swivel arm test | First thing I entered into the NHC to install
to the target kart mounting clip, and remove
excess tools and materials from the hotcell |
|
2200
|
Monday, March 15, 2021, 13:01 |
Isaac Earle | Crane | Development | | | Plate & pin lift assembly load testing (ITA6550) | In mid-2020 design analysis was completed
on the steel plate & pin assemblies (ITA6550)
used to connect the ISAC target hall crane |
11x |
2206
|
Friday, March 26, 2021, 12:22 |
Adam Newsome | Crane | Development | | | Aux Hoist Pendant Upgrade | The crane pendant for the auxiliary hoist
was upgraded to a FLEX EX2 style pendant
by Canco Cranes. The installation work was |
|
2214
|
Friday, April 30, 2021, 14:09 |
Luca Egoriti | ITE/ITW | Development | TM4 | | TM4 resistance measurements for P2N | Friday, April 30, 2021, 14:06
Anders and Luca
Resistance measurements on each electrical |
|
2217
|
Tuesday, May 25, 2021, 15:59 |
Matthew Gareau | North Hot-Cell | Development | | | Removed boot from left hot manipulator | Myself and Isaac removed the boot
from the left hot manipulator.
- opened the hatch in the TH to get |
7x |
2241
|
Wednesday, August 11, 2021, 11:15 |
Adam Newsome | Spent Target Vault | Development | | | Mini-Storage: Cable track for e-chain installed | A cable track was installed between the
mini-storage vault and the silos, for the
purpose of implementing a retractable cable |
|
2250
|
Thursday, September 23, 2021, 19:04 |
Adam Newsome | Spent Target Vault | Development | | | Mini-Storage: Remote Capability | Remote capability was added for the mini-storage
door control. The control signals originate
from the Opto 22 Module box that is used |
|
2271
|
Friday, November 19, 2021, 12:48 |
Adam Newsome | South Hot-Cell | Development | | | Vertical motion limit switch installation | A rotary limit switch was installed, attached
to the shaft adjacent to the drive motor
for the vertical drive system. This limit |
|
2309
|
Friday, February 25, 2022, 10:22 |
Adam Newsome | South Hot-Cell | Development | | | Addition of E-Stops and Turntable Vertical Motion Limit Switch | Two changes have been made to the control
system to the South Hot Cell:
Addition of two emergency |
|
2313
|
Monday, April 04, 2022, 21:04 |
Carla Babcock | Conditioning Station | Development | TM2 | | HV testing of IGLIS wires in TM2 | TM2 is in the TCS without containment box
for HV testing following the installation
of the IGLIS wiring. |
|
2366
|
Wednesday, September 14, 2022, 13:45 |
Adam Newsome | Spent Target Vault | Development | | | Storage Vault: cable replaced and e-chain upgrade | The motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran |
|
2375
|
Friday, October 07, 2022, 14:46 |
Adam Newsome | South Hot-Cell | Development | | | Addition of lift table to E-stop circuit | A modification was made to integrate the
hot cell's lift table into the E-stop circuit.
See work permit I2022-10-07-1 |
|
2421
|
Wednesday, March 01, 2023, 10:01 |
David Wang | ITE/ITW | Development | | | vacuum pit ventilation upgrade. | vacuum pit ventilation upgrade was done
last week. The jobs include: installed two
industrial cooling fans. One |
|
2427
|
Monday, March 13, 2023, 11:25 |
Carla Babcock | ITE/ITW | Development | | | 10kOhm resistors installed in ITE/ITW faraday cages | On Sept. 14 2022, a 10kOhm 30W resistor
was installed in each target station faraday
cage, in line with the HV bias supply. This |
|