Subject: Pail transfers 

Two pail transfers took place April 25th.

Ta#47 transfered from pail 137 to pail 201. existing plastic bag from 137 showed many areas of typical age/rad damage related failure.

 

Ta#45 in pail 124 was transfered to pail 202. Pail 124 also contained the shutter and "roof mounted" img gauge from TM2 that were removed in 2015 in addition to a bunch of fasteners, heat shrink tubing (from lock lever rings from an previous methods of spent target packaging) etc. The original plastic bag in pail 124 had completely failed and shredded and flaky. The shutter and extraction electrode from Ta#47 were put in pail 202 with Ta#45...cabling of the shutter being completely intertwined with the target.

Attachment 1: 20190425_133750.jpg  1.346 MB  Uploaded Monday, April 29, 2019, 09:06  | Show | Hide all
Attachment 2: 20190425_134106.jpg  1.380 MB  Uploaded Monday, April 29, 2019, 09:07  | Show | Hide all