Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1935     Entry time: Friday, June 07, 2019, 13:11
Author: David Wang 
Category: Conditioning Station 
Type: Development 
Module: TM4 
Target/Number:  
Subject: TCS and TM4.  

TM4 has been connected at TCS for HV test. TCS water system and vacuum pumps are switched on.

ELOG V2.9.2-2455