ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2508   Wednesday, November 29, 2023, 12:45 Carla BabcockITEStandard Operation  gas lines pumped downPumped down the gas lines in ITE on Tuesday
Nov. 28 2023 and opened the CF4 bottle valves.
Missed the small section between the regulator
  
  2511   Friday, December 15, 2023, 11:31 Adam NewsomeSpent Target VaultStandard Operation Ta#58Pail repack, transfer to mini-storage vaultPail 211 which contained Ta#58 spent target
was repackaged into Pail 286 in the South
Hot Cell.
 Target_Index_2023-12-15.pdf 
  2512   Thursday, December 21, 2023, 09:37 Ferran Boix PamiesITEDevelopment  Rewiring of TC multiping wiresThursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger
  
  2518   Wednesday, January 10, 2024, 11:24 Travis CaveSpent Target VaultStandard Operation Ta#66Spent Target Move The spent Ta#66 was moved from the
south hot cell to the spent target vault,
it was placed in pail#285 and placed in spot
 Target_Index_2023-01-10.pdf 
  2521   Thursday, January 11, 2024, 13:57 David WangITWStandard Operation  ITW entrance module has been disconnect.ITW entrance module has been disconnected
per document190510. It will be moved to SHC
for diagnostic group tomorrow. 
  
  2522   Friday, January 12, 2024, 10:53 David WangSouth Hot-CellStandard Operation  ITW entrance module has been moved from ITW to SHC. ITW entrance module has been moved from
ITW to SHC. The move is smooth.  I cleaned
entrance module tank flange and o r-ing slot. 
  
  2524   Wednesday, January 17, 2024, 20:09 Carla BabcockSouth Hot-CellStandard Operation Ta#66Ta#66 post irradiation inspectionOn Jan. 9 we did the PIE on Ta#66. Opened
the heat shield and removed the EE. The inside
of the heat shield was very black with lots
 20240109_100926(1).jpg20240109_101053.jpg20240109_102409.jpg 
  2525   Monday, January 22, 2024, 09:50 David WangITWStandard Operation  ITW entrance module has been moved from SHC to ITW.ITW entrance module has been moved from
SHC to ITW. A slightly bump on module shielding
block bottom side corner to tank vessel side
  
  2526   Monday, January 22, 2024, 09:56 David WangITWStandard Operation  Entrance module has been connected in ITW pit.Entrance module has been connected in ITW
pit per document 190510 " entrance module
disconnection and removal procedure".
  
  2530   Thursday, January 25, 2024, 07:24 David WangCraneStandard Operation  targe hall annual crane inspectionTom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom  has
this inspection record in his file. The crane
  
  2531   Thursday, January 25, 2024, 07:27 David WangCraneStandard Operation  Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01   and ITA0494-1997-02
yesterday. He certified the use of these
  
  2532   Thursday, January 25, 2024, 07:31 David WangCraneStandard Operation  Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and   plates ITA6550-01
yesterday. He certified the use of these
  
  2538   Tuesday, February 06, 2024, 13:28 David WangITWMaintenance  ITW exit 1 module has been disconnected and reconnected for o ring replacementITW exit 1 module was disconnected 
for Exit module flange o -ring replacement
yesterday. After oring replacement, the module
  
  2539   Tuesday, February 06, 2024, 13:36 David WangITWMaintenance  ITW exit 1 module tank flange o ring has been replaced. ITW exit 1 module tank flange o ring has
been replaced. the old o r-ing was completely
flat in slot without elastic property. 
  
  2540   Friday, February 09, 2024, 12:52 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - five flasks loadedToday (2024-02-09), five flasks were loaded
in preparation for shipment with the following
targets: SiC#41, SiC#42, Nb#9, UC#36, Ta#58.
 Target_Index_2024-02-09.xlsm 
  2541   Monday, February 12, 2024, 18:44 Carla BabcockITWMaintenance  ITW annual HV testingITW was set up for HV testing - water is
running and at a high resistivity due to
injected N. Einzel lens is attached to ground.
 Screenshot_from_2024-02-12_18-44-03.png 
  2542   Wednesday, February 14, 2024, 11:32 Adam NewsomeSpent Target VaultStandard Operation UCx#43Spent Target MoveSpent target UCx#43 (pail 289) was moved
from the South Hot Cell to the Storage Vault,
placed in location 2A. Dose rate at 1m was
 Target_Index_2024-02-14.xlsm 
  2543   Wednesday, February 14, 2024, 11:34 Adam NewsomeSpent Target VaultStandard Operation Misc.Three pails moved from main vault to mini vaultIn preparation for F-308 loading, three
pails were moved from the main storage vault
to the mini storage vault. The following
 Target_Index_2024-02-14.xlsm 
  2544   Thursday, February 15, 2024, 13:52 David WangITWStandard Operation  ITW entrance module and exit 1 module leak check after module move and tank flange orings replacement. ITW entrance module and exit 1 module
leak check on module service cap/top air
to vacuum seals and module to tank flange 
  
  2545   Thursday, February 15, 2024, 17:40 Carla BabcockITEStandard Operation  ITE annual HV testingITE was set up for HV tests - this time
the module plug was not in so the BIAS and
EE had to be bypassed. NOTE: ITE:BIASPLC
  