Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2496     Entry time: Friday, October 13, 2023, 11:51
Author: David Wang 
Category: ITE/ITW 
Type: Maintenance 
Module:  
Target/Number:  
Subject: ITH:MP1 is replaced due to its poor performance.  

ITH:MP1 is replaced this morning due to its poor performance started yesterday afternoon. The general field in pit is about 260usv/hr. the contact field on pump is 2.0 msv/hr. New pump works good. Lubricant in pump will be drained next week. then motor will be removed. The pump body will be bagged and stored in silo area.

ELOG V2.9.2-2455