Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2504     Entry time: Wednesday, November 22, 2023, 12:24
Author: Adam Newsome 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: Ta#65 
Subject: Spent Target Move 

The spent Ta#65 target was removed from the south hot cell and placed in the spent target vault. It was placed in pail #284 and placed in spot 2B. It was 41 mSv/hr at 1 m upon removal. Target index spreadsheet updated.

ELOG V2.9.2-2455