Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 134 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2530   Thursday, January 25, 2024, 07:24 David WangCraneStandard Operation  targe hall annual crane inspectionTom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom  has
this inspection record in his file. The crane
  
  2531   Thursday, January 25, 2024, 07:27 David WangCraneStandard Operation  Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01   and ITA0494-1997-02
yesterday. He certified the use of these
  
  2532   Thursday, January 25, 2024, 07:31 David WangCraneStandard Operation  Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and   plates ITA6550-01
yesterday. He certified the use of these
  
  2538   Tuesday, February 06, 2024, 13:28 David WangITWMaintenance  ITW exit 1 module has been disconnected and reconnected for o ring replacementITW exit 1 module was disconnected 
for Exit module flange o -ring replacement
yesterday. After oring replacement, the module
  
  2539   Tuesday, February 06, 2024, 13:36 David WangITWMaintenance  ITW exit 1 module tank flange o ring has been replaced. ITW exit 1 module tank flange o ring has
been replaced. the old o r-ing was completely
flat in slot without elastic property. 
  
  2540   Friday, February 09, 2024, 12:52 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - five flasks loadedToday (2024-02-09), five flasks were loaded
in preparation for shipment with the following
targets: SiC#41, SiC#42, Nb#9, UC#36, Ta#58.
 Target_Index_2024-02-09.xlsm 
  2541   Monday, February 12, 2024, 18:44 Carla BabcockITWMaintenance  ITW annual HV testingITW was set up for HV testing - water is
running and at a high resistivity due to
injected N. Einzel lens is attached to ground.
 Screenshot_from_2024-02-12_18-44-03.png 
  2542   Wednesday, February 14, 2024, 11:32 Adam NewsomeSpent Target VaultStandard Operation UCx#43Spent Target MoveSpent target UCx#43 (pail 289) was moved
from the South Hot Cell to the Storage Vault,
placed in location 2A. Dose rate at 1m was
 Target_Index_2024-02-14.xlsm 
  2543   Wednesday, February 14, 2024, 11:34 Adam NewsomeSpent Target VaultStandard Operation Misc.Three pails moved from main vault to mini vaultIn preparation for F-308 loading, three
pails were moved from the main storage vault
to the mini storage vault. The following
 Target_Index_2024-02-14.xlsm 
  2544   Thursday, February 15, 2024, 13:52 David WangITWStandard Operation  ITW entrance module and exit 1 module leak check after module move and tank flange orings replacement. ITW entrance module and exit 1 module
leak check on module service cap/top air
to vacuum seals and module to tank flange 
  
  2545   Thursday, February 15, 2024, 17:40 Carla BabcockITEStandard Operation  ITE annual HV testingITE was set up for HV tests - this time
the module plug was not in so the BIAS and
EE had to be bypassed. NOTE: ITE:BIASPLC
  
  2546   Friday, February 16, 2024, 10:57 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - three flasks loadedToday (2024-02-16), three flasks were loaded
in preparation for  shipment with the following
targets: UCx#39, UCx#41 and C#3.
 Target_Index_2024-02-16.xlsm 
  2547   Friday, February 16, 2024, 11:48 David WangCoolingMaintenance  high active water transferr to holding tank100 liters of high active water from HALCW
system( mostly from s-tank and pipe lines
closing to pumps) are transferred to holding
  
  2548   Friday, February 23, 2024, 06:36 David WangITEMaintenance  ITE entrance module has been disconnected.ITE entrance module has been disconnected
per document 190510. Its a preparation job
for next month module moving out to SHC.
  
  2550   Thursday, March 14, 2024, 14:54 David WangITEMaintenance  ITE entrance module has been moved from ITE pit to TCS. ITE entrance module has been moved from
ITE pit to TCS. The move is smooth.ITE entrance
module top tank flange and o ring slot are
  
  2552   Thursday, March 21, 2024, 11:35 Ferran Boix PamiesITEDevelopment  Wiring of new thermocouple PLC module Thursday, March 21, 2024, 11:33 Three
channels are available now for thermocouple
readouts from the Target multipin. Wiring
  
  2553   Monday, March 25, 2024, 10:53 David WangITERepair  ITE entrance module has been moved from TCS to ITE.ITE entrance module has been moved from
TCS to ITE. The move is smooth. 
  
  2554   Monday, March 25, 2024, 10:55 David WangITEStandard Operation  ITE entrance module has been reconnected in ITE pit. ITE entrance module has been reconnected
in ITE pit per document 190510. 
  
  2556   Wednesday, March 27, 2024, 09:52 David WangITEStandard Operation  ITE entrance module top and module flange o-ing to tank have been leak checked.ITE entrance module top and module flange
o-ing to tank have been leak checked. no
leak at 0.0xe-9 atm.cc/sec. things are double
  
  2558   Wednesday, April 03, 2024, 10:48 chad fisherSouth Hot-CellMaintenance  SE Manipulator wrist swapOn April 2, 2024 the wrist on the SE manipulator
of the SHC (Serial # 7986) was swapped with
a rebuild unit originally from SW position
 original_but_incorrect_cable_routing_E-HD_manipulators.JPG 
ELOG V2.9.2-2455