Entry  Thursday, January 25, 2024, 07:24, David Wang, Crane, Standard Operation, , , targe hall annual crane inspection 
Entry  Thursday, January 25, 2024, 07:27, David Wang, Crane, Standard Operation, , , Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 
Entry  Thursday, January 25, 2024, 07:31, David Wang, Crane, Standard Operation, , , Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01 
Entry  Tuesday, February 06, 2024, 13:28, David Wang, ITW, Maintenance, , , ITW exit 1 module has been disconnected and reconnected for o ring replacement 
Entry  Tuesday, February 06, 2024, 13:36, David Wang, ITW, Maintenance, , , ITW exit 1 module tank flange o ring has been replaced.  
Entry  Friday, February 09, 2024, 12:52, Adam Newsome, Spent Target Vault, Standard Operation, , , F-308 flask loading - five flasks loaded Target_Index_2024-02-09.xlsm
Entry  Monday, February 12, 2024, 18:44, Carla Babcock, ITW, Maintenance, , , ITW annual HV testing Screenshot_from_2024-02-12_18-44-03.png
Entry  Wednesday, February 14, 2024, 11:32, Adam Newsome, Spent Target Vault, Standard Operation, , UCx#43, Spent Target Move Target_Index_2024-02-14.xlsm
Entry  Wednesday, February 14, 2024, 11:34, Adam Newsome, Spent Target Vault, Standard Operation, , Misc., Three pails moved from main vault to mini vault Target_Index_2024-02-14.xlsm
Entry  Thursday, February 15, 2024, 13:52, David Wang, ITW, Standard Operation, , , ITW entrance module and exit 1 module leak check after module move and tank flange orings replacement. 
Entry  Thursday, February 15, 2024, 17:40, Carla Babcock, ITE, Standard Operation, , , ITE annual HV testing 
Entry  Friday, February 16, 2024, 10:57, Adam Newsome, Spent Target Vault, Standard Operation, , , F-308 flask loading - three flasks loaded Target_Index_2024-02-16.xlsm
Entry  Friday, February 16, 2024, 11:48, David Wang, Cooling, Maintenance, , , high active water transferr to holding tank 
Entry  Friday, February 23, 2024, 06:36, David Wang, ITE, Maintenance, , , ITE entrance module has been disconnected. 
Entry  Thursday, March 14, 2024, 14:54, David Wang, ITE, Maintenance, , , ITE entrance module has been moved from ITE pit to TCS.  
Entry  Thursday, March 21, 2024, 11:35, Ferran Boix Pamies, ITE, Development, , , Wiring of new thermocouple PLC module 
Entry  Monday, March 25, 2024, 10:53, David Wang, ITE, Repair, , , ITE entrance module has been moved from TCS to ITE. 
Entry  Monday, March 25, 2024, 10:55, David Wang, ITE, Standard Operation, , , ITE entrance module has been reconnected in ITE pit.  
Entry  Wednesday, March 27, 2024, 09:52, David Wang, ITE, Standard Operation, , , ITE entrance module top and module flange o-ing to tank have been leak checked. 
Entry  Wednesday, April 03, 2024, 10:48, chad fisher, South Hot-Cell, Maintenance, , , SE Manipulator wrist swap original_but_incorrect_cable_routing_E-HD_manipulators.JPG