1250
|
Thursday, June 02, 2016, 18:04 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | | 5K mega test on TM3 |
|
|
1252
|
Friday, June 03, 2016, 16:04 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | | 5K mega test on TM3 |
|
|
330
|
Monday, May 06, 2013, 15:45 |
Bevan Moss | Conditioning Station | Repair | TM3 | | 55 pin connector removed | Travis and I removed the 55 pin connector
from the service cap today. The feed through
was left in place as a new design for the |
|
1212
|
Thursday, April 14, 2016, 12:56 |
David Wang | ITW | Standard Operation | TM1 | | 5 shielding blocks have been moved to ITW. | The ITW is configured to take proton beam. |
|
447
|
Wednesday, September 11, 2013, 09:35 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks have been moved to ITW | I moved 5 shielding blocks to ITW this
morning .I checked the water signals in electrical
room before the moving, and everything is |
|
581
|
Monday, January 20, 2014, 13:35 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks had been moved out of ITE | 5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF
ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND
ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR |
|
399
|
Tuesday, July 09, 2013, 14:26 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks had been transferred from ITE to ITW | 5 shielding blocks had been transferred
from ITE to ITW. The ITW is configured
to take proton beam. |
|
1943
|
Friday, June 14, 2019, 08:15 |
David Wang | ITE | Standard Operation | TM2 | | 5 shielding blocks are moved to ITE. | ITE is configured to take proton beam. |
|
2042
|
Tuesday, January 07, 2020, 09:37 |
David Wang | ITW | Standard Operation | | | 5 shielding blocks are moved out of ITW top. | 5 shielding blocks are moved out of itw
top. |
|
374
|
Tuesday, June 04, 2013, 12:36 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks are transferred from ITW to ITE | Dan an I transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam. |
|
700
|
Tuesday, July 08, 2014, 09:57 |
David Wang | ITE | Standard Operation | TM3 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
734
|
Wednesday, August 20, 2014, 10:25 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. ITE is configured
to take proton beam. |
|
801
|
Tuesday, November 25, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
884
|
Friday, April 10, 2015, 15:40 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 shielding blocks have been transferred
to ITE. The ITE is configured to take proton
beam. |
|
954
|
Friday, June 19, 2015, 11:52 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
1091
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
1092
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
1268
|
Monday, June 27, 2016, 13:45 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been transferred from ITW to ITE. | ITE is configured to take proton beam. |
|
1319
|
Monday, August 15, 2016, 10:08 |
David Wang | ITE | Standard Operation | TM4 | UC#17 | 5 Shielding blocks have been transferred from ITW to ITE. | Dan and I transferred 5 shielding blocks
from ITW to ITE. The ITE is configured to
take proton beam. |
|
1368
|
Tuesday, October 04, 2016, 09:18 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|